Laserfiche WebLink
13) On page G.7.1 a single point annular sensor is being proposed(instead of the dual high <br /> and low sensor),please revise and resubmit. Also on the same G.7.1 only one FE Petro <br /> leak detector is being listed, clarify which leak detectors will be installed on 87/91 tanks, <br /> revise the parts list to reflect the correct system inventory <br /> Response: Item Z29 on sheet G7.1 indicates a dual float hydrostatic sensor is proposed. <br /> Item Z14 for the single point hydrostatic sensor has been removed. There are three (3) FE <br /> Petro leak detectors listed (items Y01 and Y02/ sheet G7.1). Both were previously listed as <br /> Y01, which has been corrected. Y01 is the sensor for the unleaded gasoline puinps (typ 2) <br /> and Y02 is for the diesel pump. <br /> 14)Please point out the spill containers and their water-tight VPHshields on the parts list <br /> and their reference number on drawings,please provide drawing reference where water <br /> tight construction is detailed or provide a revised drawing illustrating the water tight <br /> construction of all sumps. <br /> Response: Multi-ports have been revised to a Phil-Tite multi-port package, which includes <br /> the watertight sump shields, muti-port manway, spill buckets, swivel adapters and caps, riser <br /> adapters, riser adjustment brackets, and overfill valves. See revised equipment schedule for <br /> revisions to items F26, F27, and F28 (as well as items L19, L24, L26, L27, L29, L57, and <br /> L68) <br /> 15)Confirm that the UDC foot print will match the dispensers foot print and all piping and <br /> filters will drain directly into respective UDC without any retrofit modifications,please <br /> provide a reference to that effect on your plans <br /> Response: The Bravo B8000 Series UDC is ordered to fit the project specific Gilbarco <br /> Encore dispensers. The note on sheet G5.0/detail 3 has been expanded, stating, "The UDC <br /> foot print will match the dispensers foot print and all piping and filters will drain directly into <br /> respective UDC without any retrofit modifications." <br /> 16)Please provide a detailed vacuum zone map illustrating ends of each vacuum zone, any <br /> vacuum jumper hoses, sensor location for each vacuum zone, and vacuum zone volumes. <br /> Response: A detailed vacuum zone map has been added as sheet G6.2 with the requested <br /> information. <br /> 17)Identify piping cross-over distances on your plans <br /> Response: Distances between pipes are clearly shown in detail 3/ sheet G1.0 (12"min. <br /> between VR and product pipes). These distances translate directly to the crossovers as well. <br /> 18)Identify overfill and striker plates on tank cross-section drawings <br /> Response: A note has been added to the cross sections on sheet G3.0: "See details 1 & 2, <br /> sheets G4.0 and G4.1 for fill tubes, overfill valves, tank probes, and striker plates. <br /> 19)Identify the location of monitoring panel and emergency shut off on your drawings <br />