Laserfiche WebLink
Response: The monitoring panel is keynote #9 on sheet GO.1 and the location inside the <br /> store has been added. ESO is keynote #6 on GO.1 and its location is on the front of the store <br /> and the trash enclosure. <br /> 20)Please provide overfill calculations on the manufacturer supplied calculation worksheet <br /> Response: Requested calculations attached based on tank charts. Note calculations based on <br /> field measurements to be completed by contractor in the field. —,-,, <br /> Respectfully, <br /> Pedro McCracken DESIGN GROUP, INC. <br /> Mel Higginbotham, <br /> Project Architect <br />