My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:47:39 AM
Creation date
9/8/2020 2:12:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
76 FUEL ISLAND & CARWASH
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
03
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTY SENSOILMAKEIMODEL LOCATION VACUUM ZONES LEGEND GENERAL NOTES <br /> P <br /> 1 3 ZONE VACUUM SENSOR KIT TANK #1 III - BUT. PRODUCT PIPING q1 VACUUM TUBING aI <br /> 7 9 9 <br /> VEEI)FR-ROOT 1LS350R VEEDER ROOT #2 - RUL TURBINE SUMP, FILL SUMP, VACUUM PIPING ANNULAR CONNECTION TO SUMP DESIGN <br /> -- p V1DE1_ 1YJ1W q( 63300485 #3 -VAPOR LINE ANNULAR - 1 ALL VACUUM TUBING MUST BE VEEDER ROOT <br /> 2 J ALL DISPENSER SUMPS APPROVED VACUUM TUBING. <br /> �-�T-T� 3 -WAYVALVE <br /> 12. . � Hffl 2 ROOT #3RNAL1-6) MUTBEUSEDWHVEEDER Architectural <br /> 1 320NE VACUUM SENSOR KIT TANK #2 p4 - PUL PRODUCT PIPING AN EXTERNAL SIPHON <br /> TBEUSELVE (VEEN IMKING <br /> VEEDER ROOT 05 - PULTURBINE SUMP, FILL SUMP, VACUUM PIPING ANNULAR A VACUUM SOURCE CONNECTION BETWEEN Solutions Group <br /> — II3300485 a6 - RUL AND PUL VENT PIPING, VENT SUMP COMMUNICATION <br /> SVCS SYSTEM SENSORS AND THE SIPHON PORT <br /> COMMUNICATION CARTRIDGE FOR ALL TURBINES, 693D <br /> TE 10 DRIVE <br /> TESTINGNERIFICATION SURE 100 <br /> REMOTE ROCKLIN. CA 95677 <br /> VENT '-- 1 3 ZONE VACUUM SENSOR KIT TANK#3 #7 - DSL PRODUCT PIPING 3 ALL SUMPSPENETRANDVENT SUMPSTIONS THROUGH TANK SUMPS, <br /> SUMP p VEEDER ROOT #e - DSL TURBINE SUMP, FILL SUMP, VACUUM PIPING ANNULAR UDC SUMPS VENT SUMPS TO BE MADE BEA <br /> 1 #330020-85 #9 - DSL VENT PIPING ® QUALIFIED CONTRACTOR. ���1 1� <br /> GUTTER 4 ALL CONTAIMENT SUMPS TO BE INSTALLED PER aq. w. raaaw�.a <br /> THE MANUFACTURERS INSTALLATION <br /> BOX Q INSTRUCTIONS, <br /> j I 4 <br /> S ALL CONDUIT BE INSTALLED ABOVEATIONSFUELLINEP PENETRATIONS, �D J-BOXES TO �SED ARCA <br /> r � . P 4 Fci <br /> 6 CONTRACTOR SHALL POSITION LIQUID ONLY A' <br /> SUMP SENSORS AT SUMP LOW POINT ON SIDE <br /> 1 2 3 TANK #1 20K GALLON CLOSEST TO PRODUCT PIPING. RDJ. 1/31121 <br /> EPJ-SOXVVITH <br /> TURBINE <br /> REGULAR UNLEADED <br /> CORD GRIP ENTRIES RUL FILU �'aJ T2s <br /> j I VAPORSUMP FOFCALiF° <br /> r____--__---_—_ ----- WITH 1-12X1/4' WITH 1-12X1/4' <br /> BRASS BUSHING AND BRASS BUSHING AND <br /> 114' BRASS BARB 114' BRASS BARB <br /> FITTING BY GC FITTING BY GC <br /> TURBINE SYPHON <br /> CHECKVALVE S' OVER 2' FIBERGLASS PIPING, <br /> USED FOR VACUUM <br /> STP POWER <br /> i I <br /> I I <br /> ' PRODUCT UNE VENT INE VAPOR <br /> MANIFOLD <br /> j __-_-_-_-_-_-_-_-_-_-_-_- _ .... <br /> O f O <br /> j I ?u U <br /> j TANK #2 8K GALLON ° <br /> TANK #3 12K GALLON 3 <br /> 7 8 9 DIESEL I EPJPENTRLBOX IES PREMIUM UNLEADED U U 0 <br /> CORD GRIP ENTRIES 4 5 6 � U � U Z <br /> TURBINE TURBINE w <br /> EPJ-BOX WITH SUMP 30 OVER Z' j SUMP S' OVER T <br /> CORD GRIP ENTRIES FIBERGLASS PIPING, DSL FILU FIBERGLASS PIPING, PUL FILU <br /> USED FOR VACUUM USED FOR VACUUM <br /> VAPORSUMP VAPORSUMP <br /> g <br /> �- ----- WITH 1-i2 X 114' `----- <br /> WITH 1-12 X 1/4' WITH 1-12 X 1/4' WITH 1-12 X //4' <br /> BRASS BUSHING AND BRASS BUSHING AND BRASS BUSHING AND BRASS BUSHING AND Y © a <br /> Ile BRASS BARB 1W BRASS BARB 114' BRASS BARB 114' BRASS BARB F <br /> FITTING BY GC FITTING BY GC FITTING BY GC FITTING BY GC <br /> TURBINE SYPHON TURBINE SYPHON <br /> CHECKVALVE CHECK VALVE <br /> STP POTTER STP POWER <br /> OD C E VENT UNE ODUCT LINE VENT INE <br /> VAPOR L <br /> MANIFOLD f <br /> LINE Z <br /> C <br /> d Z 2 <br /> UDC UDC UDC O O m <br /> SUMP IIS SUMP a3 SUMP 41 J F Q 3 g <br /> ATMO PHERE VENT TO VERIFICATION MANIFOLD TYPQ Q ® j c~faj D <br /> W j <br /> C) LLI < Q <br /> FROM ADD'L DISPENSER Z) W V <br /> SUMP ANNULAR NOTE: J LL IL J <br /> INSTALL VERIFICATION MANIFOLD O <br /> AT FURTHEST END OF SECONDARY <br /> FROM REGULAR FROM SUPREME PIPING (PRODUCTAND VAPOR) FOR L� <br /> PRODUCT ANNULAR COMMUNICATION TEST OF VACUUM r C0 <br /> PRODUCT ANNULAR <br /> ¢ <br /> Q <br /> PRODUCT PIPING TERMINATION AT <br /> VAC GAUGE 3 PRE-ASSEMBLED FURTHEST DISPENSER FROM <br /> VALVE , MANIFOLD TANKS (TYP. FOR EACH PRODUCT) <br /> Project Nv ber <br /> VENT TO DNP17002, 2 <br /> ATMOSPHERE <br /> Sheet Nome <br /> FROM VAPOR <br /> RECOVERY VEEDER ROOT <br /> ANNULAR UDC Q ® VACUUM MONITORING <br /> Y TO DISPENSER SUMP SUMP #6 uDC UDC <br /> (UDC) ANNULAR TO PRODUCT SUMP a4 suMp az DIAGRAM <br /> ANNULAR <br /> (IF APPLIC.) 2 <br /> 12 <br /> VACUUM MANIFOLD <br /> R :::: r <br /> Sheet NmbeVEEDER ROOT VACUUM MONITORING DIAGRAM m Gtr <br /> 2 VACUUM SENSOR VERIFICATION MANIFOLD <br /> do A <br />
The URL can be used to link to this page
Your browser does not support the video tag.