Laserfiche WebLink
06 / 28 / 2019 19 : 29 8327674 EMIRS PAGE 07 <br /> Page — of <br /> SWRCB January 2002 <br /> .� 7. UNDCR-DISIPENSUR CONTAINMENT UAC TESTING <br /> Test Method Developed By : <br /> h UDC Manufacturer I'� Industry Standard X P►�ofessional Engineer <br /> 0 Other (Specify) <br /> Test Method Used : <br /> Pressure D Vacuum X Hydrostatic <br /> Q Other (Spec) <br /> 1 11 <br /> `fest Equipment Used: Caldwell Level Change Indicator <br /> Equipment Resolution : .002 <br /> UDC # 1 &2 UDC # 3 &4 UDC # UDC # <br /> UDC Manufacturer: Bravo Bravo <br /> UDC Material : Coated Steel Coated Steel <br /> s„ 9>. <br /> UDC Depth : <br /> Height from UDC Bottorn to Top Enters from bottom Enters from bottom <br /> of 1-ii hest Pi in Penetration: <br /> Height from UDC Bottom. to Enters fi"orn Bottom Enters from Bottom, <br /> Lowest Electrical Penetration : D <br /> Condition of UDC prior to Dry Dry <br /> testin : <br /> Portion of UDC Tested ] Water Line 6" Water Line 7" <br /> Does turbine shut down when NO <br /> UDC sensor detects liquid (both No <br /> .product and water)? * <br /> Turbine shutdown response time N/A N/A <br /> Is system programmed for fail- Yes Yes <br /> safe shutdown?" <br /> Was fail-safe verified to be No No <br /> operational?* <br /> Wait time between applying 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time. 3 :47 8 :52 <br /> Initial Readin (Rj) : .001 .001 <br /> 'fest End Time: 9 : 17 9 :22 <br /> Final Readin Rr : .001 .001 <br /> 'fest Duration : 30 Minutes 30 Minutes <br /> Change in Readin RF.R, : 0 0 <br /> Pass/Pail Threshold or Criteria: 005/30 Minutes . 005/30 Minutes <br /> ;.: <br /> I'esIs <br /> Was sensor removed testing? No No <br /> Was sensor properly replaced and N/A. N/A <br /> verified functional after testin► ? <br /> Comments — (include information on re airs made prior to testtr , and recommended follow-u for ailed tests) <br /> ify how much was tested . if the f�swcr co any of the questions indicated with an <br /> 1f the entire depth of the UDC is not tested, spec <br /> asterisk ( * ) is "NO" or "NA" , the entire UDC must be tested. (Sec SW1tCB 1 G- 160) <br /> f <br /> Received Time Jun , 28 . 2019 7 : 27PM No , 5223 <br />