Laserfiche WebLink
06 / 28 / 2019 19 : 29 8387674 EP'IILS PAGE 08 <br /> Page of <br /> SWRCl3 , January 2002 <br /> g, )PULL RISER CONTAINMUENT SUMiP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sums x <br /> Fill Riser Containment Sumps are Present, but were Not Tested <br /> Indust Standard Professional trigineer <br /> Test Method Developed 13y : u Sump Manufacturer industry <br /> 0 Other (S ecify) <br /> Test Method Used: <br /> Pressure 0 Vacutim Hydrostatic <br /> 0 Other (Specify <br /> Fest Equipment Used: Equipment Resolution : <br /> Fill Sum # Fill Sum # 5FillSum # Fill Suet # <br /> _ Sum Diameter. <br /> Sum Dc the <br /> Height from Tank Top to Top of <br /> Highest Pi in Penetration : <br /> Height from Tank Top to Lowcst <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> testin : <br /> Portion of SuMp Tested <br /> surn.2 Material . <br /> Wait time between applying <br /> water and Starting test: <br /> Test Start Time: <br /> Initial Rcadiu Ra <br /> If est End Time : <br /> Final Reain RF <br /> Fest Duration ; <br /> Chan 7e in Reading (RvmRI): <br /> Pass/Fail Threshold or Criteria: <br /> is there a sensor in the sum ? <br /> Does the sensor alatxn when <br /> either product or water 1s <br /> detected? <br /> Was sensor removed for testing? <br /> Wa5 sensor properly replaced and <br /> verified functional after testing? <br /> COMMents — include in ormation on re airs made prior to testin , and recommended /low-u or failed rests <br /> Received Time Jun . 28 , 2019 7127PM No , 5223 <br />