My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
104
>
2900 - Site Mitigation Program
>
PR0526562
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:04 AM
Creation date
9/9/2020 4:49:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0526562
PE
2950
FACILITY_ID
FA0017979
FACILITY_NAME
BC PROPERTIES LLC
STREET_NUMBER
104
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04124047
CURRENT_STATUS
01
SITE_LOCATION
104 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> September 12,2006 <br /> Upon collection of the samples, the remaining borehole annulus will be backfilled with neat cement <br /> in accordance with approved method (i.e. tremmie pipe) and completed with concrete slurry to the <br /> surface to match surrounding surfaces. <br /> Chemical Analyses: Selected soil and water samples will be analyzed for total petroleum <br /> hydrocarbons(TPH)as gasoline,TPH as diesel,and volatile organic compounds by EPA test method <br /> 8260B. <br /> Soil and Water Disposal: Soil cuttings, equipment wash and rinse water will be stored onsite in <br /> labeled DOT-approved drums pending analytical results. <br /> Site Investigation Report <br /> After the analytical results are received, an investigation report will be prepared and will include the <br /> following: <br /> • A summary of the site background and history, <br /> • Descriptions of the drilling and soil sampling methods, <br /> • Tabulated soil and groundwater results, <br /> • A site map showing the boring location, <br /> • Analytical reports and chain-of-custody documentation, <br /> • Boring logs. <br /> • Soil and water disposal methods,and <br /> • Conclusions and recommendations. <br /> SCHEDULE AND CLOSING <br /> Bay plans conducting the drilling on October 11,2006. We anticipate that the work will be completed <br /> in one day. We anticipate submitting a subsurface investigation report six weeks after receiving final <br /> analytical results. <br /> We appreciate the opportunity to work with you on this project. Please contact Misty Kaltreider at <br /> (707)254-9886 or(707)337-3768(cell phone)with any questions or comments. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.