My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRETHEWAY
>
18247
>
2900 - Site Mitigation Program
>
PR0545762
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 11:01:46 AM
Creation date
9/10/2020 10:51:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545762
PE
2965
FACILITY_ID
FA0025908
FACILITY_NAME
R & G SCHATZ WINERY
STREET_NUMBER
18247
Direction
N
STREET_NAME
TRETHEWAY
STREET_TYPE
RD
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
02
SITE_LOCATION
18247 N TRETHEWAY RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADMINISTRATIVE CIVIL LIABILITY COMPLAINT ORDER NO.R5-2005-0528 -3- <br /> RODNEY AND GAYLA SCHATZ <br /> MOKELUMNE RIM VINEYARDS <br /> SAN JOAQUIN COUNTY <br /> Compliance with WDRs <br /> The Discharger has failed to comply with a number of the Provisions of the WDRs: <br /> i. The January and February 2005 monitoring reports indicate that wastewater in the pond <br /> contained less than 1.0 mg/l dissolved oxygen, in violation of Discharge Specification <br /> No. B.6 which requires a minimum dissolved oxygen level of 1.0 mg/l. Inadequate <br /> dissolved oxygen concentrations indicate inadequate aeration is available in the pond. <br /> WDR Provision Lb required an analysis of the need for pond aeration and if necessary, <br /> installation of an aeration system by I September 2004. This requirement was not met. <br /> ii. The wastewater pond possessed inadequate freeboard in February 2005. Inadequate <br /> freeboard may indicate that the pond is too small. The Discharger's 7 June 2005 <br /> response to the Regional Board's 30 August 2004 NOV confirmed that the pond is <br /> smaller than described in the RWD. Discharge Specification B.14 requires the <br /> wastewater system to have sufficient capacity to accommodate wastewater flow and <br /> precipitation. WDR Provision G.Lb required a schedule for construction of <br /> improvements, which has not been received. The current pond capacity is too small for <br /> the permitted wastewater flows and is therefore in violation of the WDRs. <br /> iii. As of the date of the NOV,the Discharger had not complied with the groundwater <br /> monitoring portion of the WDRs. Staff commented on workplans for the groundwater <br /> well installation in correspondence dated 27 August 2004 and 5 May 2005. A revised <br /> workplan was submitted on 20 October 2005. That workplan,with a minor addendum, <br /> has now been found acceptable. WDRs Provision G.Lf required wells to be installed no <br /> later than 15 September 2004, but the wells have not yet been installed and the <br /> installation is more than a year overdue. <br /> INADEQUATE OR INCOMPLETE TECHNICAL REPORTS <br /> 8. WDRs Provision G.Lb required submittal of a Water Balance and Treatment Report by 17 June <br /> 2004. The original submittal was dated 24 June 2004; staff notified the Discharger that it was <br /> inadequate in the 30 August 2004 NOV. A revised report was submitted on 7 June 2005, but it is <br /> still inadequate because it failed to include a schedule for implementation of improvements. In <br /> addition, staff has serious concerns about the approach to provide aeration to the pond. A <br /> 12 September 2005 letter from Mokelumne Rim Vineyards states, "Aeration has been installed. <br /> The pond size is appropriate for the facilities operations." However, the Discharger has not <br /> submitted the monitoring data to show that the aeration system is adequate to maintain 1.0 mg/I <br /> dissolved oxygen in the pond. Staff also note that the 7 June 2005 revised report indicated the <br /> pond size does not comply with the Discharge Specifications of the WDRs, and that there is no <br /> indication that it has been expanded. To date, a complete report has not been received. <br /> 9. WDRs Provision G.l.c required submittal of a Groundwater Well Installation Workplan by <br /> 17 June 2004. Versions of the workplan were submitted three times (28 June 2004, 14 March <br /> 2005, and 23 May 2005); each of which were granted conditional approvals by staff(27 August <br />
The URL can be used to link to this page
Your browser does not support the video tag.