ADMINISTRATIVE CIVIL LIABILITY COMPLAINT ORDER NO. R5-2005-0528 -5 - <br /> RODNEY AND GAYLA SCHATZ <br /> MOKELUMNE RIM VINEYARDS <br /> SAN JOAQUIN COUNTY <br /> but not both." <br /> 18. CWC Section 13350(e)(1) states: "The civil liability on a daily basis may not exceed five thousand dollars <br /> ($5,000)for each day the violation occurs." <br /> 19. CWC Section 13350(e)(1)(B) states: "(B)When there is no discharge,but an order issued by the regional board <br /> is violated,except as provided in subdivision(f),the civil liability shall not be less than one hundred dollars($100)for <br /> each day in which the violation occurs" <br /> 20. CWC Section 13327 states: "In determining the amount of civil liability,the regional board ... shall take into <br /> consideration the nature,circumstance,extent,and gravity of the violation or violations,whether the discharge is <br /> susceptible to cleanup or abatement,the degree of toxicity of the discharge,and,with respect to the violator,the ability <br /> to pay,the effect on ability to continue in business, any voluntary cleanup efforts undertaken,any prior history of <br /> violations,the degree of culpability,economic benefit or savings,if any,resulting from the violation,and other matters <br /> as justice may require." <br /> 21. As of 12 October 2005, the Discharger has failed to submit the following complete or substantially <br /> complete technical reports: <br /> a. The Water Balance and Treatment Report(due on 17 June 2004; 482 days overdue). <br /> b. The Groundwater Well Installation Workplan(due on 17 June 2004; 482 days overdue). An <br /> acceptable workplan was submitted on 20 October 2005. <br /> c. The Land Application Area Improvement Report(due on 13 July 2004; 456 days overdue). <br /> d. The Operation and Management Plan (O&M Plan)(due on 13 July 2004; 456 days overdue). <br /> e. The Groundwater Well Installation Report of Results(due on 5 April 2005; 190 days overdue). <br /> f. The Salinity Reduction Study(due on 15 September 2004; 392 days overdue). <br /> 22. The required technical reports are a cumulative total of 2,458 days late. The maximum liability <br /> under CWC Section 13268(b)(1) for the nonsubmittal of these technical reports is $1,000 per day <br /> late, for a total maximum liability of two million, four hundred fifty eight thousand dollars <br /> ($2,458,000). No minimum liability is required to be imposed under Section 13268(b)(1). <br /> 23. As of 12 October 2005, the Discharger has failed to submit the following complete or substantially <br /> complete self-monitoring reports: <br /> Monitoring Report Due Date Status Da. sy Late <br /> May, 2004 7/1/2004 Not Submitted 468 <br /> June, 2004 8/1/2004 Not Submitted 437 <br /> July, 2004 9/1/2004 Not Submitted 406 <br /> August, 2004 10/1/2004 Not Submitted 376 <br /> September, 2004 11/1/2004 Not Submitted 345 <br /> October, 2004 12/1/2004 Not Submitted 315 <br />