My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 10:41:14 AM
Creation date
9/10/2020 1:34:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAID JOA UI I <br />. COUNTY <br />— <br />Environmental Health Department <br />Underground Storage Tank Program Inspection Report <br />Facility Name: <br />Facility Address: <br />Date: <br />JAMAR SERVICE <br />4075 E MAIN ST STOCKTON <br />May 09 2019 <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />Item # <br />Remarks <br />209 <br />CCR 2716(a -e) Failure to conduct the designated UST operator visual inspection at least once every 30 days. <br />The designated operator failed to check and note all required items on the visual inspection reports. The incorrect and <br />missing information included the following from the inspection reports: <br />-Section V was left blank. <br />- Section VI was blank and unsigned by owner/operator. <br />-The question regarding UDC sensor locations was left blank. <br />-Tank and line tightness testing was left blank. <br />During the visual inspection, the designated operator shall check that all required testing and maintenance for the UST <br />system have been completed and shall check all required items on the report. Ensure that designated operators <br />performing visual inspections at this facility are including all of the required information on the reports. <br />This is a minor violation. <br />320 <br />CCR 2635, 2637.2, 2665, 2712 Failure to comply with the installation, inspection, or record keeping of the overfill <br />prevention. <br />-The 87 mechanical flappers used as the overfill prevention system was marked as a failure on the 10/3/18 Overfill <br />Prevention Equipment Inspection Report. <br />-Calculations included in the 10/3/19 inspection report do not match the tank charts on site. <br />-A permit has been applied for on 4/8/19 for replacement of drop tubes and is not yet approved. <br />All UST systems must be equipped with an approved, functional overfill prevention device at all times during fuel <br />deliveries. The failed components must be repaired or replaced by a properly licensed, trained, and certified contractor <br />under permit and inspection of the EHD. If the failed components can't be replaced immediately, there is a possibility <br />that the 87 and diesel UST systems may be red tagged to prevent fuel inputs. <br />This is a Class II violation. <br />Overall Inspection Comments: <br />Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br />documenting the corrective actions that have been or will be taken for each violation, and any supporting <br />paperwork, by June 8, 2019. <br />Starting September 1, 2018, all in -office CERS help will be provided at EHD hourly rate ($152). To schedule an <br />appointment, please call (209) 468-3420. <br />Documents provided: Return to Compliance Certification form, schedule of free CUPA classes <br />AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING THIS <br />FACILITY BACK INTO COMPLIANCE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />Received by: Date: May 09, 2019 <br />Inspector: <br />Inspector Phone: <br />Ftl�� Printed Name and Title: <br />STACY RIVERA, Senior REHS <br />(209) 468-3440 <br />linda strickln, cashier <br />FA0002121 PR0231667 SCO01 05/09/2019 <br />EHD 23-01 Rev. 09/28/2018 Page 5 of 5 Underground Storage Tank Program OIR <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.