My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2300 - Underground Storage Tank Program
>
PR0231669
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 11:45:11 AM
Creation date
9/10/2020 1:39:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231669
PE
2361
FACILITY_ID
FA0001480
FACILITY_NAME
JACKSONS ENERGY #6822
STREET_NUMBER
2132
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17306035
CURRENT_STATUS
01
SITE_LOCATION
2132 MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM(Page 2 of 6) <br /> V. TANK SECONDARY CONTAINMENT INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Modern welding A W1 I B ® C © D <br /> A❑ I B El I C ❑ I D <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ®Industry Code or Engineering Standard(Specify):Vacuum <br /> ❑Engineered Method(Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Tank Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> ICC UST Certification#8819639 10/25/2019 <br /> VI. COMMENTS <br /> Provide any additional comments hem. <br /> Started 87 tank at 11:00 am at 7 hg ended at 12:00 pm at 7 hg <br /> Started 91 tank at 11:30 am at 7 hg ended at 12:30 pm at 7 hg <br /> Started 89 tank at 12:15 pm at 7 hg ended at 1:15 pm at 7 hg <br /> Started Diesel tank at 10:40 am at 7 hg ended at 11:40 am at 7 hg <br /> *NOTE*No Inspector present for testing. <br /> VII. PRODUCT PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Environ A © 8 Z I C ® D <br /> A B Lj I C 0 1 D Ll <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ® Industry Code or Engineering Standard(Specify): pressure <br /> ❑Engineered Method(Specify): <br /> # <br /> Attach the testing procedures and all documentation required to determine the results. of Attached Pages <br /> Product Piping Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> ICC UST Certification#8819839 10/25/2019 <br /> Interstitial Communication Verification Method Used: <br /> VIII. COMMENTS <br /> Provide any additional comments hem. <br /> B7 product line failed due to torn test boots in UDC's 112,314,and 718 <br /> 91 product line failed due to torn test boot in UDC 112 <br /> Diesel product line failed, needs further investigation <br /> 89 product line started at 11:30 am at 5 psi ended at 12:30 pm at 5 psi test passed. <br /> ID=Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.