My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2300 - Underground Storage Tank Program
>
PR0231669
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 11:45:11 AM
Creation date
9/10/2020 1:39:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231669
PE
2361
FACILITY_ID
FA0001480
FACILITY_NAME
JACKSONS ENERGY #6822
STREET_NUMBER
2132
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17306035
CURRENT_STATUS
01
SITE_LOCATION
2132 MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' l <br /> PEI/RPtzpo - lz <br /> theft are iteiiis that must be repaired or replaced 6 . 5. 6 Test Procedure. <br /> ( e.g . , deteriorated penetration fitting boots), 1. Begin the test by adding water to the sump to a <br /> notify the owner/operator and obtain approval minimum of 4 inches above the highest sump <br /> prior to proceeding with repairs. penetration or sump sidewall seam, whichever is - � <br /> 4. Test hoots or secondary containment tegmina- higher. To compensate for sump deflection , the <br /> tion fittings must be present on the piping pen- water must be allowed to settle a minimum of <br /> titrating the sump. During testing, these fittings 15 minutes before taking the initial test measure- <br /> prevent water from entering the interstitial space ment, if the highest sump penetration or sump <br /> of double -wallet! piping. Without these fittings , sidewall seam is less than 4 inches from the top <br /> the integrity of the sump cannot he tested using of the sump, add water to within i inch of the <br /> this method . top of the sump . <br /> S. If interstitial monitoring sensors are present 2. Place the measuring stick vertically at the lowest <br /> within the containment sumps, temporarily point in the sump and extending above the water <br /> remove them before conducting the test . If the level in the sump to allow for an accurate mean <br /> sensor is removed, reposition after testing to surement to be taken . The location of the mea- <br /> appropriate position according to the manufac- curing stick must remain the same foreach water <br /> turer ' s instructions . level measurement . Document the initial water <br /> 6. if the containment sump is found to have cracks, level measurement as measured from the bottom <br /> loose parts or separation of any joints or penetra - of the sump. Alternative measurement methods <br /> tion fittings , it is not considered to be liquid- may he used provided that the measurement to <br /> tight. This visually indicates a test failure , 1 / 16 ( U.00ii) inch can be made . <br /> 3. Take all precautions to prevent the water level <br /> CAUTION Water can damage electrical from being disturbed duruig the- duration or the <br /> connections . Ensure that there are no test4 <br /> components that can be damaged by the 4 . After I Hour, document the ending water level <br /> addition of water to the sump. If such measurement . <br /> components are present , take appropriate <br /> precautions when performing the test or 5. Upon completion of the test : <br /> use an alternative test method , remove all water and properly dispose of it <br /> according to Section 6. 7 . <br /> - _ reinstall any interstitial monitoring sensors iti <br /> their proper positions , <br /> • return the test boots or secondary contamn <br /> ment fittings to their pie-test operating con- <br /> - figurations; <br /> yyi,tor Elat�tnc�i <br /> Luvat Junr_ton <br /> f <br /> Electr;r: ' <br /> Y1a!e, <br /> Rtn4um <br /> p;t, i nl j <br /> Eldefrk�l <br /> Conduit <br /> F'raduet <br /> FIGURE 6. 5. The test fluid level in the UDC must be at - '- — Patna <br /> least 4 Inches above the highest sump penetration or <br /> sidewall seam . <br /> - - - - FIGURE 6.6 . To prevent leakage, check all penetration ... <br /> fittings before adding water to ensure they make a tight <br /> seal. <br /> pef . brg <br />
The URL can be used to link to this page
Your browser does not support the video tag.