Laserfiche WebLink
Page of <br /> 4 . TANK ANNULAR TESTING <br /> Test Method Developed By : x Tank Manufacturer u Industry Standard ❑ Professional Engineer <br /> ❑ Other (Specif y) <br /> Test Method Used : ❑ Pressure x Vacuum ❑ Hydrostatic <br /> ❑ Other (.Specify) -- <br /> fest Equipment Used : Gast Vacuum Pump/ Vacuum Gauges m Hg. —�qu � pnient Resolution : - 1 /2" x 30" Hg. <br /> Tanit # 1 87 Slave Tank #2 87 Master Tank #3 Diesel Tanlc 94 91 <br /> [ s 'TaCxempt from Testing? ' u ~ i ❑ Yes x No ❑ Yes xNo 13 Yes xNo El Yes xNo <br /> nk <br /> Tank Capacity : 9490 9490 — 9490 9490 <br /> Tank Material : <br /> FRP FRP FRP <br /> Tank Manufacturer : XERXES XERXES XERXES XERXES <br /> Product Stored : 87 91 Diesel 91 <br /> Wait time between applying <br /> pressure/vacuum/water and 10 MillUtt; S 10 Minutes 10 Minutes 10 Minutes <br /> starting; test : — — <br /> Test Start Time : 10 : 30 a. m . 10 :45 a.m . 10 : 55 a .m . 111 : 05 a . m . <br /> Initial Reading ( Ri) : <br /> 12" Hg. 1211 Hg 1211 Hg12." Hg . <br /> Test End Time : 11 : 30 a . m . 11 : 115 a. m . 11 : 55 a. m. 12. : 05 p.m . <br /> Final Reading (RF) : 12" 1-Ig. 12" Hg. 12" Hg 12" Hg. <br /> Test Duration : 1 Hour 1 Hour 1 Hour I Hour <br /> Change in Reading (RF-R+) : 0" 1-Ig. 0" Hg 0„ Hg 0„ Hg <br /> Pass/Fail Threshold or Criteria : +/- 0" 1-1g. +/-0" Hg. +/4" Hg. +/- 0" Hg. <br /> Test Results x Pass ❑ Fail x Pass ❑ Fail x Pass ❑ Fail x Pass ❑ Fall <br /> Was sensor removed for testing? Yes xNo 0 N Yes xNo DNA Yes No ❑ NA Yes xNo DNA <br /> Was sensor properly replaced and Yes No x NA Yes No x NA Yes x No NA Yes x No ❑ NA <br /> veriled functional after testis ? <br /> Comments — (include ir�for•mation o» repairs made prior tQ testin , and reconvnended fallow-up for failed tests) <br />