My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 4:51:42 PM
Creation date
9/10/2020 4:41:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page of �a <br /> 5 . SECONDARY PIPE TESTING <br /> Test Method Developed By : x Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> 0 Other (Specify) <br /> 'fest Method Used: x Pressure ❑ Vacuum 0 Hydrostatic <br /> ❑ Other (Specie) <br /> Test Equipment Used : Pressure Gauges in Psi/NitrogenEgtnpment Resolution : l / 10- IS Psi <br /> :. r . ,7;. ,M ,.. ,,.r <br /> - Piping Run 93 Piping Ran 44 <br /> g Run #2 91 Piping Run # I 87 Piping Diesel Sy hon <br /> Piping Material : FRP FRP FRP FRP <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> „ „ „ <br /> Piping Diameter : 3 ' 333 <br /> Length of Piping Run : Approx . 160 ' Approx . 150 ' Approx . 170 ' Approx . 30 ' <br /> Product Stored . 87 91 Diesel 87 <br /> Method and location of Test boot at 87 MasterTest boot at 91 STP Test boot at Diesel Test boot at 87 Master <br /> i in -run isolation : STP STP SCP <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> startin . test : _ -- <br /> Test Start Time : 12 : 00 p . m . 12 : 10 penis 12 :25 p .m , 12 : 20 p . m . <br /> htitial Reading (Rj) : 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time : 1 : 00 p . m . 1 : 20 p. m . 1 :25 p . m . 1 : 20 p . m . <br /> Final Reading (RF) : 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test Duration : t Hour I Hour I Hour I Flour <br /> Change in Reading (RF-Ri) : 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/fail Threshold orNo loss in Psi No loss in Psi No loss in Psi No loss in Psi <br /> Criteria : <br /> Test Result: x Pass 13 rail x Pass 13 rail x Pass ElFail _ x Pass ❑ Fail <br /> Comments — (include inforination on repairs made prior to testing and reco)iuuencled follow-IE) for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.