My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 4:51:42 PM
Creation date
9/10/2020 4:41:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page > of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By : F1 Sump Manufacturer D Industry Standard x Professional Engineer <br /> D Other (Specif <br /> Test Method Used : D Pressure D Vacuum x Hydrostatic <br /> D Other (Specif)) <br /> Test Equipment Used : Caldwell Level Change Indicator ( Equipment Resolution : . 0025 _ <br /> " y <br /> Sump 91 87 Slave Sump #2 87 Master Suunp #3 Diesel Sump 144 91 <br /> Sump Diameter 42" — 42" 42" 42 " <br /> —� 59" 59" 58 %2„ 58» <br /> Sump Depth : <br /> Sump Material : FRP FRP — FRP FRP <br /> Height from Tank Top to Top of 23„ 33„ 3315 18" <br /> Hi hest Pi in Penetration : <br /> Height fi•om Tank Top to Lowest 26„ 26" 2651 27 " <br /> Electrical Penetration : _ <br /> Condition of sump prior to testing: DRY DRY DRY DRY <br /> Portion of Sump Tested ' Water Line 27 " Water Line 37 " Water Line 37 " Water Line 22" <br /> Does turbine shut down when <br /> sump sensor detects liquid (both x Yes i7 No ❑ NA xYes DNo DNA xYes No DNA xYes ❑ No DNA <br /> roduct and water)? * <br /> Turbine shutdown response time 6 seconds 4 seconds 5 seconds 4 seconds <br /> Is system programmed for fail-safe x Yes [] No DNA x Yes ❑ No D NA xYes D No DNA xYes DNo ❑ NA <br /> shutdown? ' <br /> Was fail -safe verified to be x Yes D No DNA x Yes 0N DNA xYes DNo DNA xYes ONo DNA <br /> o erational . <br /> Wait time between applying <br /> pressure/vacuumlwater and starting 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> test: <br /> Test Start Time : 2 : 45 p. m . 2 : 05 p. m . 1 : 25 p. m . 3 : 30 p. m . <br /> Initial Reading (R►) : . 001 . 001 . 001 . 001 <br /> Test End Time: 3 : 15 p. m . 2 : 35 p . m . 1 : 55 p. m . 4 : 00 p. m . <br /> Final Reading (Rr) : . 001 wool . 001 . 001 <br /> Test Duration : 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading (RF- R, ) : 0 0 0 0 <br /> Pass/Fall Threshold or Criteria: . 005/30 Minutes . 005/30 Minutes .005130 Minutes . 005/30 Minutes <br /> Test Result: x Pass ❑ Fail x Pass D Fail x Pass ❑ Fail x Pass ❑ Fail <br /> Was sensor removed for testing? xYes D No ❑ NA xYes DNo DNA xYes D No DNA xYes O No ❑ NA <br /> Was sensor properly replaced and x Yes D No D NA x Yes D No D NA x Ycs D No DNA xYes O No ❑ NA <br /> verified functional after testin ? <br /> Comments — (include illforrr► atior� at re airs oracle prior to testing, and recarrf►tended follow-up for failed tests) <br /> t <br /> E� <br /> k <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.