My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 4:51:42 PM
Creation date
9/10/2020 4:41:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page GL of <br /> 5 . SECONDARY PIPE TESTING <br /> Test Method Developed By : x Piping Manufacturer 11 Industry Standard 0 Professional Engineer <br /> ❑ Other (Speclfj) <br /> Test Method Used : x Pressure ❑ Vacuum ❑ Hydrostatic <br /> 0 Other (Specif}) — <br /> 'rest Equipment Used : Pressure Gauges in Psi /Nitrogen Equipment Resolution : 1 / 10- 15 Psi <br /> Piping� �,i � � „ • Run #1i Piping Run #( <br /> Piping Run # Piping Run # <br /> 87Slave47Master 87Master-Diesel _ <br /> Piping Material : FRP FRP <br /> Piping Manufacturer : Smith — Smith <br /> Piping Diameter: 3 " 3 „ — <br /> Length of Piping Run : Approx. 8 ' Approx . 8 ' — <br /> Product Stored* 87 EMPTY <br /> Method and location of Test boot at 87 Master Test boot at 87 STP <br /> ii ill -run isolation : STP <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Minutes 10 Minutes <br /> starting test : — <br /> Test Start Time : 12 : 35 p .m . 12 : 10 p . m . <br /> Initial Reading (Rr) : 5 Psi 5 Psi <br /> Test Land Time : 1 : : 35 p . m . I A0 p . m . __ — <br /> Final Reading (RF) : 5 Psi 5 Psi <br /> Test Duration : 1 Hour 1 I-loin <br /> Change in Reading ( RF-Rr) : 0 Psi 0 Psi <br /> Pass/Fail Threshold o► No loss in Psi No loss in Psi <br /> Criteria : _ <br /> Test Result: x Pass 0 Fail x Pass iPass 0 Fail Pass ❑ Fail <br /> Comments — (include information on repairs made prior to testing and reconnneraded follow)- ttp for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.