Laserfiche WebLink
Page GL of <br /> 5 . SECONDARY PIPE TESTING <br /> Test Method Developed By : x Piping Manufacturer 11 Industry Standard 0 Professional Engineer <br /> ❑ Other (Speclfj) <br /> Test Method Used : x Pressure ❑ Vacuum ❑ Hydrostatic <br /> 0 Other (Specif}) — <br /> 'rest Equipment Used : Pressure Gauges in Psi /Nitrogen Equipment Resolution : 1 / 10- 15 Psi <br /> Piping� �,i � � „ • Run #1i Piping Run #( <br /> Piping Run # Piping Run # <br /> 87Slave47Master 87Master-Diesel _ <br /> Piping Material : FRP FRP <br /> Piping Manufacturer : Smith — Smith <br /> Piping Diameter: 3 " 3 „ — <br /> Length of Piping Run : Approx. 8 ' Approx . 8 ' — <br /> Product Stored* 87 EMPTY <br /> Method and location of Test boot at 87 Master Test boot at 87 STP <br /> ii ill -run isolation : STP <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Minutes 10 Minutes <br /> starting test : — <br /> Test Start Time : 12 : 35 p .m . 12 : 10 p . m . <br /> Initial Reading (Rr) : 5 Psi 5 Psi <br /> Test Land Time : 1 : : 35 p . m . I A0 p . m . __ — <br /> Final Reading (RF) : 5 Psi 5 Psi <br /> Test Duration : 1 Hour 1 I-loin <br /> Change in Reading ( RF-Rr) : 0 Psi 0 Psi <br /> Pass/Fail Threshold o► No loss in Psi No loss in Psi <br /> Criteria : _ <br /> Test Result: x Pass 0 Fail x Pass iPass 0 Fail Pass ❑ Fail <br /> Comments — (include information on repairs made prior to testing and reconnneraded follow)- ttp for failed tests) <br />