Groundwater Monitoring <br /> Well Installation and <br /> ARCADIS Sampling Work Plan <br /> PG&E McDonald Island <br /> Compressor Station <br /> 4. Schedule and Reporting <br /> Monitoring well installation, development,and sampling are anticipated to take a total <br /> of four field days to complete.The implementation schedule for all field events will be <br /> dependent on the availability of a qualified PG&E observer. Following the well <br /> installation and groundwater sampling, a letter report will be prepared for submittal to <br /> the Central Valley Water Board.The letter will include a summary of field activities and <br /> results,a table and figure showing sample results and the final well locations, and a <br /> schedule for quarterly sampling. <br /> Mcdonald Island Addtl MW Installation Work Plan.00cx 9 <br />