Laserfiche WebLink
Groundwater Monitoring <br /> Well Installation and <br /> �? ARCADIS Sampling Work Plan <br /> PG&E McDonald Island <br /> Compressor Station <br /> 5. References <br /> ARCADIS U.S., Inc. (ARCADIS).2010a. Site Sampling and Soil Removal Work Plan, <br /> C-51 Tank Site, Pacific Gas and Electric Company McDonald Island Compressor <br /> Station, Zuckerman Road, Near Holt, California. February 19. <br /> ARCADIS.2010b. Excavation and Sampling Work Plan, Pacific Gas and Electric <br /> Company, C-51 Tank Site, McDonald Island Compressor Station, Zuckerman <br /> Road, Near Holt, California. June 1. <br /> ARCADIS. 2010c. Excavation and Sampling Report, Pacific Gas and Electric <br /> Company, C-51 Tank Site, McDonald Island Compressor Station, Zuckerman <br /> Road, Near Holt, California. October 19. <br /> ARCADIS. 2011. Groundwater Monitoring Well Installation and Third Quarter 2011 <br /> Sampling Report, Pacific Gas and Electric Company, McDonald Island <br /> Compressor Station, Zuckerman Road, Near Holt, California. November. <br /> California Regional Water Quality Control Board, Central Valley Region. 2011. Re: <br /> Excavation and Sampling Report, Pacific Gas and Electric Company, McDonald <br /> Island Compressor Station, Near Holt, San Joaquin County. March 11. <br /> California Regional Water Quality Control Board, Central Valley Region. 2008.A <br /> Compilation of Water Quality Goals. July. <br /> California Regional Water Quality Control Board, San Francisco Bay Region. 2008. <br /> Screening for Environmental Concerns at Sites with Contaminated Soil and <br /> Groundwater. Interim Final—November 2007. Revised May. <br /> MSE Group. 2009. 2008 Annual Groundwater Monitoring Report. Post-Closure <br /> Monitoring Program, Former Class II Surface Impoundments, McDonald Island <br /> Gas Storage Facility, California. January 30. <br /> Mcdonald Island Addll MW Installation Work Plan Doc, 10 <br />