My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CRESTWOOD
>
2056
>
2300 - Underground Storage Tank Program
>
PR0542283
>
INSTALL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 8:47:43 AM
Creation date
9/14/2020 10:51:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2020
RECORD_ID
PR0542283
PE
2351
FACILITY_ID
FA0024277
FACILITY_NAME
ARCO AMPM
STREET_NUMBER
2056
STREET_NAME
CRESTWOOD
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2056 CRESTWOOD AVE
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RED THREAD°11 Piping System <br /> GENERAL SPECIFICATIONS i,_.NviR0NMEN1 ', <br /> DEPARTMENT <br /> SECTION 1 _-,Scoff 2.03 Operating Conditions - In addition to the above <br /> This section covers the use of fiberglass reinforced plastic listed minimum design requirements, the system shall <br /> (FRP) pipe for mild chemical and water services up to 210`F meet the following minimum operating conditions: <br /> and 450 psig steady pressure. <br /> a.Operating Pressure <br /> The piping system shall be furnished and installed complete b.Operating Temperature <br /> with all fittings,joining materials,supports,specials, and other c. Fluid Conveyed <br /> necessary appurtenances. d.Test Pressure <br /> SECTION 2-General Conditions 2.04 Quality Assurance- Pipe manufacturer's qual- <br /> 2.01 Coordination - Material furnished and work per- ity program shall be in compliance with ISO 9001 and/ <br /> formed under this section shall be coordinated with related or API Q1. <br /> work and equipment specified under other sections. <br /> Valves Section 2.05 Delivery. Storage. and Handling - Pipe and fit- <br /> Supports Section tings shall be protected from damage due to impact and <br /> Equipment Section point loading. Pipe shall be properly supported to avoid dam- <br /> age due to flexural strains. The contractor shall not allow dirt, <br /> 2.02 Governing Standards-Except as modified or sup- debris, or other extraneous materials to get into pipe and <br /> plemented herein, all materials and construction methods fittings. All factory machined areas shall be protected from <br /> shall comply with the applicable provisions of the following sunlight until installed. <br /> specifications and be tested using the following standards: <br /> 2.06 Acceptable Manufacturers - NOV Fiber Glass <br /> Standard Specifications Systems, 501-568-4010, or approved equal. <br /> Standard Specification for Filament-Wound <br /> ASTMSECTION 3 - Materials and Construction <br /> D2996 "Fiberglass" (Glass-Fiber-Reinforced-Ther- <br /> mosetting Resin) Pipe 3.01 2"-24" Pipe - The pipe shall be manufactured by <br /> ASTM Standard Specification for Reinforced the filament winding process using an amine cured epoxy <br /> 4024 Thermosetting Resin (RTR) Flanges thermosetting resin to impregnate strands of continuous glass <br /> Standard Specification for "Fiberglass" filaments,which are wound around a mandrel at a 543/a°wind- <br /> ASTM (Glass-Fiber-Reinforced-Thermosetting- ing angle under controlled tension. Pipe shall be heat cured <br /> D5685 Resin) Pressure Pipe Fittings and the cure shall be confirmed using a Differential Scanning <br /> Calorimeter. <br /> Standard Test Methods <br /> Standard Practice for Obtaining Hydrostatic Pipe shall be supplied with a matching tapered bell and a <br /> ASTM or Pressure Design Basis for "Fiberglass" matching tapered spigot. <br /> D2992 (Glass-Fiber-Reinforced-Thermosetting <br /> Resin) Pipe and Fittings Pipe shall have a minimum continuous steady pressure rat- <br /> ASTM Standard Practice for Measuring Beam ing of 225 psig at 210'F in accordance with ASTM D2992 <br /> D2925 Deflection of Reinforced Thermosetting Procedure A. <br /> Plastic Pipe Under Full Bore Flow <br /> ASTM Standard Test Method for Short Time Hy- All pipe shall be 100%hydrotested at the factory before ship- <br /> D1599 draulic Failure Pressure of Plastic Pipe,Tub- ment at a minimum pressure of 300 psig. <br /> ing and Fittings <br /> Standard Test Method for Longitudinal Ten- 3.02 Flanges and Fittings - All fittings shall be manu- <br /> ASTM sile Properties of "Fiberglass" (Glass-Fiber- factured using the same type materials as the pipe. Fittings <br /> D2105 Reinforced Thermosetting Resin) Pipe and may be manufactured either by compression moldinq� s ray- <br /> Tube up/contact molding, r eFt winding met� ods.^_a hl...� <br /> ASTM Standard Test Method for Determination of .r <br /> D2412 External Loading Characteristics of Plastic <br /> Pipe by Parallel-Plate Loading <br /> AL <br /> www.fgspipe.com DEPARTMENT <br /> . T <br /> 2700 West 65th Street 25 S.Main Street NW Fiber Glass Systems <br /> Little Rock,Arkansas 72209 Sand Springs,Oklahoma 74063 <br /> Phone:1 (501)568-4010 1 (918)245-6651 <br />
The URL can be used to link to this page
Your browser does not support the video tag.