My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CRESTWOOD
>
2056
>
2300 - Underground Storage Tank Program
>
PR0542283
>
INSTALL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 8:47:43 AM
Creation date
9/14/2020 10:51:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2020
RECORD_ID
PR0542283
PE
2351
FACILITY_ID
FA0024277
FACILITY_NAME
ARCO AMPM
STREET_NUMBER
2056
STREET_NAME
CRESTWOOD
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2056 CRESTWOOD AVE
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fittings shall be adhesive bonded matched tapered bell and 4.02 Pipe Installation - Pipe shall be installed as speci- <br /> spigot, threaded or grooved adapters, or flanged. Fittings fied and indicated on the drawings. <br /> shall be certified to ASTM D5685. <br /> The piping system shall be installed in accordance with the <br /> Flanges shall have ANSI 816.5 Class 150 bolt hole patterns. manufacturer's current published installation procedures. <br /> 3.03 Adhesive- Adhesive shall be manufacturer's stan- 4.03 Testing - A hydrostatic pressure test shall be con- <br /> dard for the piping system specified. ducted on the completed piping system. The piping system <br /> shall be subjected to 10 pressurization cycles from 0 psig to <br /> 3.04 Gaskets- Gaskets shall be 1/8"thick, 60-70 durom- 11/2 times the design operating pressure as stated In section <br /> eter full-face type suitable for the service shown on the draw- 2.03.d. After the 10 cycles, the pressure shall be held on the <br /> ings and as recommended in the manufacturer's standard system for a minimum of 1 hour and the line Inspected for <br /> Installation procedures. leaks. <br /> 3.05 Bolts. Nuts. and Washers-ASTM A307, Grade B, Test pressure shall not exceed 11/2 times the maximum rated <br /> hex head bolts shall be supplied. SAE washers shall be sup- pressure of the lowest rated element in the system. <br /> plied on all nuts and bolts. <br /> Lines that are subjected to severe temperature cycles shall <br /> 3.06 Acceptable Products-RED THREAD II as manufac- be tested at 11/2 times the cyclic pressure rating of the low- <br /> tured by NOV Fiber Glass Systems,or approved equal. est rated component, even if the system shall operate at low <br /> pressure. <br /> SECTION 4- Installation and Testing <br /> 4.01 Training and Certification -All joints installed or The system shall be filled with water at the lowest point and <br /> constructed in the field shall be assembled by employees of air bled off from the highest point. Systems shall be brought <br /> the contractor who have been trained by the pipe manufac- up to test pressure slowly to prevent water hammer or over- <br /> turer. The pipe manufacturer or their authorized represen- pressurization. <br /> tative shall train the contractor's employees in the proper <br /> joining and assembly procedures required for the project, All pipe joints shall be water tight. All joints that are found to <br /> including hands-on participation by the contractor's employ- leak by observation or during testing shall be repaired by the <br /> ees. Each bonder shall fabricate one pipe-to-pipe and one contractor and retested. <br /> pipe-to-fitting joint that shall pass the minimum pressure test <br /> for the application as stated in section 2.03.d without leaking. <br /> Only bonders who have successfully completed the pressure ISO 9001 <br /> test shall bond pipe and fittings. LITTLE ROCK,AR <br /> Certification by the manufacturer shall be in compliance with <br /> ASME 1331.3,Section A328.2 for the type of joint being made. <br /> NOV FIBER GLASS SYSTEMS <br /> National Oilwell Varco has produced this brochure for general information only,and it is not Intended for design purposes. Although every effort has been made to <br /> maintain the accuracy and reliability of its contents,National Oilwell Varco in no way assumes responsibility for liability for any loss,damage or injury resulting from <br /> the use of information and data herein nor is any warranty expressed or implied. Always cross-reference the bulletin date with the most current version listed at the <br /> web site noted in this literature. <br /> wwWAgspipe.com <br /> 2700 West 65th Street 25 S.Main Street 1V Fiber Glass systems <br /> Little Rock,Arkansas 72209 Sand Springs,Oklahoma 74063 <br /> Phone:1(501)568-4010 1 (918)245-6651 ®Trademark of NATIONAL OILWELL VARCO <br /> 02009,NATIONAL 01LWELL VARCO <br /> A1201 February 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.