My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
1400
>
2300 - Underground Storage Tank Program
>
PR0231951
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 9:20:00 AM
Creation date
9/14/2020 3:04:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231951
PE
2361
FACILITY_ID
FA0003704
FACILITY_NAME
DART CONTAINER CORP
STREET_NUMBER
1400
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04932015
CURRENT_STATUS
01
SITE_LOCATION
1400 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 4 of 6) <br /> XIII . VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer I IdenIlfV Tank ID from Section III for each Manufacturer <br /> A BEj G D <br /> AEl I B ❑ I CD 1 D <br /> Test Method Used : C] Manufacturer Guidelines (Specify) <br /> © Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify) <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Vapor Recovery Piping Containment Testing Training and Certifications (List applicable certifications ) Expiration Date <br /> Interstitial Communication Verification Method Used : <br /> XIV, COMMENTS <br /> Provide any additional comments here. <br /> XV. TURBINE i PRODUCT PIPING SUMP TESTING INFORMATION <br /> Manufacturer I Idenlifv Tank ID from Section ill for each Manufacturer <br /> A El I B C El I D <br /> A ❑ I B CD I D Lj <br /> Test Method Used. _ <br /> ❑ Ma—nufacturer G�uidetines pec yfT <br /> Q Industry Code or Engineering Standard (Specify) <br /> Engineered Method (Specify) : <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Turbine 1 Product Piping Sump Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> I <br /> XVI, COMMENTS <br /> Provide any additional comments here <br /> I <br /> ID = Identification <br /> F <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.