My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
1400
>
2300 - Underground Storage Tank Program
>
PR0231951
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 9:20:00 AM
Creation date
9/14/2020 3:04:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231951
PE
2361
FACILITY_ID
FA0003704
FACILITY_NAME
DART CONTAINER CORP
STREET_NUMBER
1400
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04932015
CURRENT_STATUS
01
SITE_LOCATION
1400 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page s of 6) <br /> XVII , FILL RISER SUMP TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> A ❑ I B I Co DO <br /> A Q B C ❑ I D U <br /> .. <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify). <br /> ❑ Industry Code or Engineering Standard (Specify)- <br /> [I Engineered Method (Specify). <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Fill Riser Sump Testing Training and Certifications (List applicable certifications ) Expiration Date <br /> XVIII , COMMENTS <br /> Provide any additional comments here . <br /> XIX. VENT / TRANSITION SUMP TESTING INFORMATION <br /> Manufacturer Identify Vent t Transition Sump ID from Section III for each Manufacturer <br /> a LJ I b ❑ C © d <br /> a ❑ I b *0 c ❑ d ❑ <br /> Test Method Used : - - © Manufacturer Guldelines-(Specffy)�- <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify) : <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Vent 1 Transition Sump Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> XX . COMMENTS <br /> Provide any additional comments here_ <br /> i <br /> ID = identification <br /> E <br /> 1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.