My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
2121
>
2900 - Site Mitigation Program
>
PR0515580
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:38:21 PM
Creation date
9/14/2020 3:14:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0515580
PE
2960
FACILITY_ID
FA0012230
FACILITY_NAME
MCDONALD ISLAND GAS STORAGE FAC
STREET_NUMBER
2121
STREET_NAME
ZUCKERMAN
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
2121 ZUCKERMAN
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.2 Groundwater Monitoring System <br /> The monitoring system for the former pond site historically consisted of nine <br /> groundwater monitoring wells, two well points, nine piezometers and five surface <br /> water monitoring locations. This groundwater monitoring network was installed <br /> during previous site investigations between 1985 and 1991. A detailed description of <br /> the development and components of the monitoring system are documented in <br /> various reports prepared by PG&E in 1987, 1990 and 1991. This monitoring network <br /> is shown in Figure 5. The well points, piezometers and surface water locations were <br /> used in conjunction with the monitoring wells to determine regional and site <br /> groundwater flow direction and gradient. The monitoring wells were additionally <br /> used to determine groundwater quality. <br /> 4.0 SITE CHARACTERIZATION METHODOLOGY <br /> 4.1 Well Drilling and Installation Details <br /> Details are as follows: <br /> 4.1.1 Monitoring Well Locations and Depths <br /> One shallow and one deep groundwater monitoring well will be installed in <br /> the vicinity of the DMP, at locations shown on Figure 5. The shallow well <br /> will have a screen length of ten feet. The deep well screen length will cover <br /> the distance between the first and second clay layers (approximately ten feet). <br /> Z:PROP-PfN1999%1524.pxdelivble4p-1524-I dm <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.