Laserfiche WebLink
4.3.4 Groundwater Sampling and Analysis <br /> Groundwater samples will be collected, using dedicated diaphragm pumps or <br /> bailers, and analyzed in accordance with the Sample Collection, Sample <br /> Preservation, Shipment, Chain of Custody Control, and Field and Laboratory <br /> QA/QC sections of the Existing Sampling and Analysis Plan. <br /> 4.3.5 Quality Assurance and Quality Control (QA/QC) <br /> QA/QC samples will be taken for laboratory analysis, per the standard <br /> semi-annual monitoring procedures. QA/QC samples include field blanks, <br /> trip blanks and laboratory QA/QC samples. <br /> 5.0 HEALTH AND SAFETY <br /> The Alisto Engineering Group's Site Health and Safety Plan will be sent separately. <br /> 6.0 SCHEDULE <br /> The schedule of task completion is as follows: <br /> • Investigation Work Plan Submission - Early October 1999 <br /> • Begin Fieldwork - Late October or Early November 1999 <br /> • Submit Investigation Report - January 2000 <br /> ZAPROP-PP A 1999\1574.p%dc1ivb1e14p1-1524-I.dx <br /> 16 <br />