My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
2121
>
2900 - Site Mitigation Program
>
PR0515580
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:38:21 PM
Creation date
9/14/2020 3:14:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0515580
PE
2960
FACILITY_ID
FA0012230
FACILITY_NAME
MCDONALD ISLAND GAS STORAGE FAC
STREET_NUMBER
2121
STREET_NAME
ZUCKERMAN
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
2121 ZUCKERMAN
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUP <br /> 302 Pendleton Way <br /> Oakland,CA 94621 <br /> License No.724938 <br /> October 9, 2007 <br /> Ms. Anne P. Conner <br /> Environmental Services <br /> Pacific Gas&Electric Company <br /> 375 North Wiget Lane, Suite 200 <br /> Walnut Creek, CA 94598 <br /> Subject: Work Plan for Soil and Groundwater Characterization under Pond 3 <br /> PG&E McDonald Island Gas Storage Facility <br /> McDonald Island, California <br /> Dear Anne: <br /> Attached please find MSE's Work Plan for Soil and Groundwater Characterization under <br /> Pond 3 (work plan) that details activities to be conducted within the Pond 3 footprint at the <br /> McDonald Island Gas Storage Facility. Site activities will include mobilization, set up, soil <br /> and groundwater sample collection, and demobilization. This work plan is structured as <br /> follows: Section 1 summarizes regulatory and historical background, provides detail <br /> regarding the purpose and objective of this work, and overviews current site conditions. <br /> Sections 2 and 3, respectively, discuss field support tasks and soil and groundwater <br /> sampling activities to be conducted. The sample analysis plan, data review, and process <br /> reporting are discussed in Section 4. Section 5 overviews data evaluation through both <br /> geochemical and statistical analyses and Section 6 provides references. <br /> MSE looks forward to working with PG&E on these tasks. Please do not hesitate to <br /> contact Dr. Robert Ellgas or the undersigned at (510) 383-9600 with any questions on the <br /> approach or schedule. <br /> Sincerely, <br /> MSE Group <br /> ��Z,i�—— <br /> Carl Hackney <br /> President and Managing Principal <br /> Attachment: <br /> Work Plan for Soil and Groundwater Characterization under Pond 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.