Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM Page 4 of 6 <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed If a monitoring panel Is used to perform teak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? ® ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, r[®R <br /> functional) tested and confirmed o erational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with theirro r o eration? <br /> Was monitoring system set-up reviewed to ensure proper settings? ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected, functionally tested, and confirmed operational? ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under4spenser containment? ® ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically ® ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ® ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) ® Sump ® Under-dispenser containment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? ❑ ❑ ® <br /> For any answer of "N" above describe in section W how and when these deBclenctes were or will be corrected. <br /> IX. COMMENTS <br /> X. IN TANK GAUGING TESTING <br /> ® Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section.) Y N NA <br /> This section must be completed If in-tank gauging Is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for ground ❑ ❑ ❑ <br /> faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, ❑ ❑ ❑ <br />€ and confirmed o erational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ 1 ❑ <br /> For any answer of "N" above describe in section Xt how and when these deficiencies were or will be corrected. <br /> Xi. COMMENTS <br /> Y a Voa N Nn Ns - Nnt OnnilraNa <br />