Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of 6) <br /> X8. LINE LEAK DETECTOR TESTING <br /> 0 7Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) Y N NA <br /> This section must be con l&ted if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? ® ❑ ❑ <br /> Check all that a Simulated leak rate verified: 14 3 GPH C3 0. 1 GPH ❑ 0.2 GPH <br /> Was the testing apparatus property calibrated? ® ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak Is detected? ❑ 1 ❑ <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak Is detected? ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off when a teak is detected? ® ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system Is disabled or disconnected? ® ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? 19 ❑ ❑ <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? 10 ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? 1 ® 1 ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ® ❑ ❑ <br /> For any answer of "N" above describe in section X111 how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPN monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) ® Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component(s) Monitored by this Sensor Sensor Functionality interstitial Communication <br /> Test Test <br /> S17 87 VAC PRODUCT ® Pass ❑ Fail ® Pass ❑ Fail <br /> S18 87 VAC VAPOR ® Pass ❑ Fail ® Pass ❑ Fail <br /> S19 87 VAC VENT ® Pass ❑ Fail ® Pass ❑ Fail <br /> S20 91 VAC PRODUCT ® Pass ❑ Fail ® Pass ❑ Fail <br /> S21 91 VAC VENT ® Pass ❑ Fall ® Pass [I Fall <br /> S22 DIESEL VAC PRODUCT ® Pass ❑ Fail ® Pass ❑ Fail <br /> S23 DIESEL VAC VENT ® Pass ❑ Fail ® Pass ❑ Fall <br /> I ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> j ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fall <br /> How was interstitial communication verified? ® Simulated leak at far ends of the Interstitial space. [I Visual Inspection <br /> ❑ Other (Describe the method In section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ® Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "FAIL" above describe in section XV how and when these Issues were or will be conrected. <br /> XV. COMMENTS <br /> 11=4 Ralkvmnarhnv V Vaq N ^ Nn NAcW& Rmnmblo VPil -VamnanlPnmwtrohrvdmdafir. in kionifirafim <br /> F <br /> I <br />