Laserfiche WebLink
FThisUNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM <br /> XII . LINE LEAK DETECTOR TESTING <br /> Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section.) Y N NA <br /> tion must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? EI ❑ ❑ <br /> Check all that apply.) Simulated leak rate verified : I] 3 GPH ❑ 0 . 1 GPH ❑ 0.2 GPH <br /> Was the testing apparatus properly calibrated? ❑ ❑ ❑ <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected? El ❑ ❑ <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ [i] <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected? ❑ ❑ 0 <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ ❑ FN1 <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ ❑ 0 <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks? ❑ ❑ 0 <br /> Were all items on the equipment manufacturers maintenance checklist completed? ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ❑ ❑ <br /> For any answer of "N" above, describe in section X111 how and when these issues were or will be corrected. <br /> XIII . COMMENTS <br /> i <br /> l <br /> XIV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> on Check this box if VPH monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor Functionality Interstitial Communication <br /> Sensor ID Component(s) Monitored by this Sensor Test Test <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified? <br /> F] Simulated leak at far ends of the interstitial space. Ll Visual Inspection <br /> ❑ Other (Describe the method in section XV below) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "FAIL " above, describe in section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH = Vacuum/Pressure ftdrostatic, ID = Identification <br />