My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2020 1:46:21 PM
Creation date
9/15/2020 1:05:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
AT&T CALIFORNIA - UE058
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By : ❑ Tank Manufacturer El Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used : ❑ Pressure ❑X Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : 4" Dial Gauge Equipment Resolution : A <br /> U E058U002 <br /> Is Tank Exempt From Testing? I Yes ❑No ❑Yes ❑No ❑ Yes No ❑ Yes ❑ No <br /> Tank Capacity : 10 , 152 gallons <br /> Tank Material : Steel/Fiberglass <br /> Tank Manufacturer : Modern Welding <br /> Product Stored : Diesel <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes <br /> starting test: <br /> Test Start Time : 09 : 23am <br /> Initial Reading (Rr) : - 10 " HG <br /> Test End Time : 10 : 23am <br /> Final Reading (RF) : - 10 " HG <br /> Test Duration : 1 Hour <br /> Change in Reading (RF-Rt) : 0 <br /> Pass/Fail Threshold or Criteria : o <br /> Test Result : (E] Pass ❑Fail ❑ Pass ' OFail ❑ Pass ;❑ Fall ❑ Pass ❑ Fail ' <br /> Was sensor removed for testing? ❑X Yes ON, ❑ NA ❑ Yes ONo ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> Was sensor properly replaced and ❑Yes ❑X No ❑ NA m yes ❑No ❑ NA ❑ Yes ❑No ❑ NA ❑ Yes ❑ No ❑ NA <br /> verified functional after testing? <br /> Comments — (include infon•mation on repairs made prior to testing, and recommended folloiv-up for failed tests) <br /> The sensor was reinstalled to the lowest point, but not tested . <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment, such as systems that are hydrostatically monitored or under constant vacuum , are exempt from periodic containment <br /> testing . { California Code of Regulations, Title 23 , Section 2637(x)(6) } <br />
The URL can be used to link to this page
Your browser does not support the video tag.