My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2020 1:46:21 PM
Creation date
9/15/2020 1:05:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
AT&T CALIFORNIA - UE058
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By : El Piping Manufacturer Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used : M Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : 4" Dial Gauge Equipment Resolution : . 2 <br /> UE0580002 Supply UE0580002 Return UE0580002 Vent <br /> IEEE= <br /> Piping Material : Poly Poly Poly <br /> Piping Manufacturer: Western Fiberglass Western Fiberglass Western Fiberglass <br /> Piping Diameter: 1 " 1 . 5" 3" <br /> Length of Piping Run : Approx. 30' Approx . 30' Approx. 30' <br /> Product Stored : Diesel Diesel Diesel <br /> Method and location of mTest Boots Test Boots Test Boots <br /> i gQ run isolation : <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time : 9: 02am 9 : 02am 9 : 14am <br /> Initial Reading (R,) : 5 PSI 5PSI 5 PSI <br /> Test End Time : 10 : 02am 10 : 02am 10: 14am <br /> Final Reading (RF) : 5 PSI 5 PSI 5 PSI <br /> Test Duration : 1 Hour 1 Hour 1 Hour <br /> Change in Reading (RF-R,) : 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Test Result . 0 Pass O'Fail 0 Pass ' ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments — (include information on repairs made prior to testing, and recornrriended folloly-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.