Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 6) <br /> WIN MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational ? 0 ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, 0 ❑ ❑ <br /> functionally tested , and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with 0 ❑ ❑ <br /> their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ❑X ❑ <br /> Was the monitoring panel's backup battery visually inspected , functionally tested , and confirmed operational? Q ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑X ❑ El <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically ❑X ❑ Eldisconnected ? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? <br /> Which sensors initiate positive shut down? (Check all that apply) ❑X Sump X❑ Under-Dispenser Containment XEl El <br /> If alarms are relayed to a remote monitoring station , is all communications equipment (e .g . , modem) operational? ❑ 0 <br /> For any answer of W' above, describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. IN -TANK GAUGING TESTING <br /> ❑ Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed . (Do not complete this section.) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for ❑ ❑ <br /> round faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally FX1 ❑ ❑ <br /> tested , and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑X ❑ ❑ <br /> Was accuracy of system's water level readings tested ? ❑X ❑ ❑ <br /> Were all probes reinstalled properly? ❑X El El <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? ❑X ❑ ❑ <br /> For any answer of "M' above, describe in Section Xi how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> I Y = Yes, N = No, NA = Not Applicable <br /> f <br />