Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of 6) <br /> XII . LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? 0 ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified : ❑X 3 GPH ❑ 0. 1 GPH ❑ 0. 2 GPH <br /> Was the testing apparatus properly calibrated? QX ❑ ❑ <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected ? ❑ ❑ 0 <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak is detected ? ❑ ❑ X❑ <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected? Q ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑X ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑X El E <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks? ❑X <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? ❑X <br /> Were all LLDs confirmed operational within regulatory requirements? Q <br /> For any answer of "N" above, describe in Section Xlll how and when these issues were or will be corrected. <br /> XIII . COMMENTS <br /> XIV. VACUUM / PRESSURE / HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) ❑X Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component(S) Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> S11 VAPOR RETURN ❑X Pass ❑ Fail Q Pass ❑ Fail <br /> S12 87 PRODUCT-VENT ❑X Pass ❑ Fail 0 Pass ❑ Fail <br /> S13 91 PRODUCT ❑X Pass ❑ Fail ❑X Pass ❑ Fail <br /> S14 DSL PRODUCT LINE QX Pass ❑ Fail ❑X Pass ❑ Fail <br /> S15 87 PRODUCT ❑X Pass ❑ Fail 0 Pass ❑ Fail <br /> S16 91 VENT QX Pass ❑ Fail ❑X Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified ? ❑X Simulated Leak at Far Ends of the Interstitial Space 0 Visual Inspection <br /> ❑ Other (Describe the method in section XV below.) 0 Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? Q Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "Fail' above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> RETEST L16 HIGH LIQUID SENSOR <br /> GPH = Gallons Per Hour, Y = Yes, N = No, NA = Not Applicable, VPH = Vacuum/PressureMydrostatc, ID = Identification <br />