Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> HEALTH AND SAFETY PLAN <br /> Designate hand signals here : <br /> Off-site communications : ❑ Radio X Telephone J Other <br /> The specific signal for an emergency is : Verbally Given <br /> The specific signal for an evacuation is : Verbally Given <br /> Evacuation assembly point is : Location as determined by On Site Safety Officer and marked on site map daily <br /> MARK EVACUATION ROUTE(S) ON SITE MAP CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure : <br /> All contaminated personal protective equipment (i .e . , gloves , coveralls) will be placed in DOT approved 55 - gallon steel <br /> drums . The drums are to be secured daily before personnel leave the site as well as secured and properly labeled upon <br /> the completion of the investigation activities . <br /> Location of Wash Water: At Site <br /> Location of Toilet: At Site <br /> Location of Drinking Water: Brought to Site <br /> Equipment Decontamination Procedure : Equipment will be washed with an Alconox® solution and/or <br /> steam cleaned . <br /> Materials to be disposed of as Hazardous Waste : All soil generated during the scope of work will be stored in a <br /> DOT approved 55 -gallon steel drum until a disposal profile is <br /> completed . <br /> PAGE <br />