Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> HEALTH AND SAFETY PLAN <br /> ❑ Confined Space Entry Will not be performed during this investigation <br /> ❑ Other - explain hazard and mitigation <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum Level D protection is required on all GZA work sites . Level D includes : <br /> ❑ Steel toed boots <br /> ❑ Hard Hat <br /> Safety Glasses <br /> ❑ Hearing Protection <br /> Nitrile Gloves <br /> For each task on this project identify additional protective garments as required and note the conditions under which the <br /> level of PPE would be modified for each task. <br /> Task(s) Condition Personnel Garment(s) <br /> t Working on-site All Orange/Bright Yellow Vests <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all GZA hazardous waste sites . <br /> Work Zones will be marked as follows : Cones, barricades and/or caution tape will be used to mark off <br /> exterior work zones . <br /> MARK WORK ZONES ON SITE MAP ❑. CHECK WHEN DONE. <br /> On-site communications : ❑ Radio X Verbal `❑ Hand Signals ❑ Other <br /> PAGE <br />