Laserfiche WebLink
Louise Water Treatment Facility Page 12 <br /> Lathrop,CA <br /> April 7, 2017 <br /> SECTION 4 REVIEW AND AMENDMENTS OF THE CONTINGENCY PLAN <br /> § 66265.54 <br /> 4.1 Review and Updates <br /> The Plan will be reviewed annually and modifications to the Contingency Plan will be <br /> performed, within 30 days of a change. <br /> Changes addressed will include the following: <br /> a) Applicable regulations are revised; <br /> b) The plan fails in an emergency; <br /> c) The facility changes in its design, construction, operation, maintenance, or other <br /> circumstances in a way that materially increases the potential for fires, explosions, or <br /> releases of hazardous waste or hazardous waste constituents, or changes the <br /> response necessary in an emergency; <br /> d) The list of emergency coordinators changes; or <br /> e) The list of emergency equipment changes. <br /> 4.2 Emergency Response Review <br /> Following an incident, LAWTF personnel will conduct a meeting with key members of its <br /> response organization to evaluate the response effort and review the Plan to evaluate the <br /> effectiveness and the need for Plan amendments. <br /> The Emergency Coordinator will prepare a critique that analyzes the results of the response <br /> and will suggest modifications to the Plan, if necessary. <br />