My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 10:46:32 AM
Creation date
9/17/2020 1:41:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EBW Auto Limiter II Valve Component 3 . Remove the drop tube/valve assembly from the <br /> Inspection Procedure storage tank fill riser. <br /> 4 . Place the drop tube assembly on a flat surface with <br /> EBW' s AutoLimiter II drop tube mounted overfill the float side of the overfill valve up . <br /> prevention valve includes an inspection port for 5 . Lay your tape measure or dipstick next to the <br /> periodic inspection of the valve components . With drop tube aligning the top flange to the dimension <br /> the addition of a small , resealable inspection number obtained from Step 2 . Locate , on the <br /> port though , an inspection of the valve ' s internal overfill valve assembly, the machined ring adjacent <br /> flapper assembly can now also be done . to the upper float . This ring should be identified <br /> with a "95%" stamp . Record the dimension on <br /> Periodic Auto Limiter Component and the dip stick or tape measure that aligns with this <br /> Function Inspection "95% " identification ring . This is the second stage <br /> Tools Needed shutoff point for this valve installation . This should <br /> • #2 Phillips Screwdriver <br /> be set for no more than 95% of tank capacity. <br /> • Flashlight z <br /> • EBW Service Kit ( Part #90082 ) pa <br /> ] <br /> • Tape Measure or Dipstick ' <br /> The storage tank may be under _ <br /> Warning pressure . Vent the tank prior to <br /> removing this drop tube . Highly <br /> combustible petroleum vapors . <br /> are present, so use only non - <br /> sparking tools . Figure B <br /> 6 . From the tank chart for this tank, determine the <br /> 705 Spill Containment (Ref. ) dimension off of the tank bottom for 95 % of tank <br /> Top of Riser capacity. Compare this determined dimension to <br /> the dimension obtained in Step 5 . Your calculated <br /> 95% capacity dimension should be equal to, or <br /> Riser Pipe greater than , the actual dimension measured in <br /> Step 5 . If your calculated dimension is lower, then <br /> Top of Tank the installation for this overfill valve is incorrect and <br /> 95/o needs to be immediately addressed . <br /> 7 . Locate the Phillips head screw on the right side of <br /> the float linkage ( Figure C ) . Remove the screw and <br /> save it for reinstallation . <br /> U .S .T. <br /> U . <br /> e 'M <br /> T <br /> a <br /> n � <br /> k <br /> / t <br /> 450 k r <br /> 6 Max <br /> Bottom of Tank <br /> Figure A <br /> 1 . Remove the fill adapter from the spill containment Figure C <br /> riser pipe . <br /> 2 . Using a dip stick or tape measure , determine the <br /> height of this flange off the bottom of the tank. <br /> Record this dimension . <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.