My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
1214
>
2900 - Site Mitigation Program
>
PR0009004
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2020 5:34:49 PM
Creation date
9/17/2020 4:58:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009004
PE
2954
FACILITY_ID
FA0004061
FACILITY_NAME
MCCORMICK & BAXTER CREOSOTING
STREET_NUMBER
1214
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95201
APN
14520001
CURRENT_STATUS
01
SITE_LOCATION
1214 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
review and comment. Page 26 (YES) NO <br /> b. Develop a mailing list which at the minimum <br /> includes contiguous property owners, local <br /> and state agencies; and notify them by direct <br /> mail of actions proposed in draft RAP. (YES) NO <br /> Page 26 Mailing list is addressed, but use <br /> of mailing list is limited to 1 direct mailer* <br /> C. Publish a notice of draft RAP availability for <br /> public review in a newspaper of general circu- <br /> lation in the area affected. Page 26 Mailing (YES) NO <br /> list is addressed, but use of mailing list is <br /> is limited to 1 direct mailer* <br /> d. Post notices in location where proposed removal <br /> or remedy will occur. Page 26 Specify YES (NO) <br /> locations. <br /> e. Hold one or more public meetings on draft RAP. <br /> Page 27 Suggest a follow-up meeting. (YES) NO <br /> f. Based on public comment, revise draft RAP or <br /> respond to comments. Page 27 (YES) NO <br /> 16. Has a mailing list of key contact people been <br /> compiled for the site (in the appendix) ? (YES) NO <br /> Page appendix <br /> 17 . Are any followup actions required? (YES) NO <br /> Please see attached pages. <br /> 18 . What is your overall assessment of this plan (identify problems, <br /> strong points, unresolved issues) ? <br /> Please see attached pages. <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.