My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
1214
>
2900 - Site Mitigation Program
>
PR0009004
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2020 5:34:49 PM
Creation date
9/17/2020 4:58:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009004
PE
2954
FACILITY_ID
FA0004061
FACILITY_NAME
MCCORMICK & BAXTER CREOSOTING
STREET_NUMBER
1214
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95201
APN
14520001
CURRENT_STATUS
01
SITE_LOCATION
1214 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item Paragraph Response <br /> program may be applicable for Stockton. <br /> We feel this would be a very cost ef- <br /> fective approach and would help focus <br /> any studies that may be considered for <br /> Stockton. Because our initial evalua- <br /> tion indicates off-site air contami- <br /> nant levels will be well below <br /> acceptable exposure levels we feel air <br /> monitoring is not a priority item. <br /> Task 16 1 We agree to defer the sampling issue <br /> Sewerline Integrity until the groundwater characterization <br /> Assessment is better defined. <br /> Task 2 1,2,3,4 We feel there is sufficient informa- <br /> Off-site tion to locate the next off-site wells. <br /> Wells We disagree with the DHS understanding <br /> of the groundwater data and assertion <br /> that more evaluation is needed before <br /> locating the next offsite wells. <br /> 5 Since the pump test data is conclusive, <br /> continuous coring will not be needed <br /> (as noted) . <br /> Task 3 1 We agree to discuss the groundwater <br /> Groundwater monitoring plan in the upcoming <br /> Monitoring technical meeting. <br /> 2 The objective of groundwater sampling <br /> is to collect data used to determine <br /> groundwater remediation alternatives. <br /> Pumping groundwater with a submersible <br /> pump is the best way to obtain chem- <br /> ical analysis representative of ground- <br /> water characteristics the remedial <br /> alternatives will need to treat. <br /> The objective of groundwater sampling <br /> is not to be a research study on <br /> sampling methods to ensure absolute <br /> in situ concentrations. <br /> We have agreed that when the zero <br /> concentration contour is determined, <br /> sampling will be by the best avail- <br /> able technology to support this <br /> conclusion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.