My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3040
>
2300 - Underground Storage Tank Program
>
PR0506497
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2020 10:36:12 AM
Creation date
9/21/2020 9:05:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0506497
PE
2351
FACILITY_ID
FA0007461
FACILITY_NAME
7-ELEVEN INC #14113
STREET_NUMBER
3040
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10027018
CURRENT_STATUS
01
SITE_LOCATION
3040 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tape measure <br />Seam <br />Figure 2 <br />Mark Upper Tube <br />(Cut Line) <br />STEP 3: CUT THE UPPER DROP TUBE <br />Attach the supplied band clamp to the upper tube just <br />below the mark and ensure that it is assembled square <br />to the tube. The damp can be used as a guide for mak- <br />ing a square cut. If a vise is used, clampon the valve <br />body casting only to avoid damage to the float and <br />tubes (See Figure 3A). Carefully saw through the tube <br />squarely, at the mark made in Step 2. Use a hacksaw <br />with a new fine-tooth blade. Rotating the upper tube <br />as the sawing progresses will minimize run out and en- <br />sure a square 9D -degree cut. Remove the band clamp <br />after tube is cut. <br />CAUTION -DO NUT use a pipe or tubing cutter to cut <br />the upper drop tube, this may damage the tube, <br />causing it to be out of round thereby prohibiting <br />assembly of the unit. <br />IMPORTANT: Remove a II chips and shavings gener- <br />ated in steps 3 thru 5 out of the cut end of the tube. DC <br />NOT remove chips and shavings by dumping thru valve <br />body. <br />STEP 4: FILE THE UPPER DROP TUBE <br />File the upper tube square, and remove any burrs or <br />rough edges. Make sure the cut is flat and square. <br />IMPORTANT: Carefully files good chamfer on the <br />inside edge of the drop tube to provide a lead-in for the <br />polypak seal and inlet tube installed in Step 8. <br />Figure 4 <br />STEPS. SAND THE UPPER DROP TUBE <br />Sand the Inside of the drop tube with sandpaper and/or <br />steel wool to remove all burrs and sharp edges. After <br />sanding wipe down the inside of the tube with a clean <br />rag from the top to approximately 4 inches down to <br />remove any debris. <br />Ceigtion: Failure to properly chamfer, sand, and <br />clean the drop tube may cut the seal and result in a <br />failure of a pressure decay leak test. <br />Figure 5 <br />Figure 36 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.