Laserfiche WebLink
Vapor Recovery <br />OPW <br />Sall Float <br />Tube Cut <br />per Local <br />Requirerr <br />Fill Riser <br />14"Minimum <br />Clearance for <br />Float <br />6,-f 7 , <br />4— Align Float Along Length of Tank —.�� Swivel <br />Figure 24 Product <br />Adaptor <br />Driont snrkat <br />Ffgure24A <br />Japtor be - <br />teen jack <br />rew baits <br />'4" NFT <br />Nipple <br />Jack <br />Screw <br />Kit <br />FOR TESTABLE MODELS ONLY- Check installation <br />again as done in Step 23 to ensure poppet actuates and <br />resets properly. See page 17 for Full testing details. Ap- <br />ply pipe dope to the socket adaptor threads. Pipe dope <br />should be a non -hardening gasoline resistant pipe <br />thread seal compound. Install socket adaptor and <br />torque to 3.5 ft -lbs. (42 in -lbs) minimum to 5.0 ft lbs [60 <br />in-Ibs] maximum. After installing socket adaptor where <br />required, pressure test testable overfill valve per C.AH13 <br />TP201.1 D to ensure valve is vapor tight. <br />15 <br />