Laserfiche WebLink
Phil-Tite Installation , Operation and Maintenance Manual , Page 19 Executive Order VR- 101 -N <br /> Step 2 — Dry Fit All Components <br /> Dry fit your riser to verify your measurements , After you have dry fit all components and are satisfied <br /> with your measurements , apply an approved fuel resistant , non hardening thread sealant ( pipe dope ) <br /> to the NPT threads on tank end of the risers . <br /> Step 3 — Install Tank Risers <br /> Install and torque the tank risers into the tank bungs per tank manufacture instructions . <br /> Step 4 — Install the M - 1600 Riser Support Bracket before you install the M/F 4X4 Riser Adaptors <br /> Install the M- 1600 Riser Support bracket between the two 4 inch ( Fill and Vapor) tank risers just below <br /> the top of the tank riser threads for the MIF 4X4 riser adaptors . Tighten and/or set the turn buckles to <br /> maintain the space between the two tank risers at 16 inches on center. <br /> Step 5 — Check your dimensions <br /> With the M/ F 4X4 riser adaptors and spill containers dry fitted , check the dimension from the top of the <br /> spill container to finish grade . You should have 4- '/Z inches to 5 inch clearance . Verify the height of <br /> the fiberglass platform . Check for 1 'h inches of clearance between the top of the platform and the <br /> bottom of the composite manway cover. <br /> Step 6 - Install the M/F 4X4 riser adaptors <br /> Using the M/F 4X4 Riser Adaptor Installation Instructions install and torque the M/ F 4X4 riser <br /> adaptors . <br /> Step 7 — Install the fiberglass platform before installing the 85000- EXT Spill Containers . <br /> The Watertight Fiberglass Platform must be installed and latched down before the 85000-EXT Spill <br /> Containers can be installed . <br /> You are now ready to install the 85000-EXT Spill Containers . Refer to the 85000-EXT Series Spill <br /> Container Installation Instructions on the following pages . <br />