My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2050
>
2800 - Aboveground Petroleum Storage Program
>
PR0516363
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:48:28 AM
Creation date
9/22/2020 8:04:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0516363
PE
2832
FACILITY_ID
FA0010987
FACILITY_NAME
TEC Equipment
STREET_NUMBER
2050
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
Ave
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
2050 E Louise Ave
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention Control and Countermeasures Plan <br /> TEC Equipment Inc. <br /> 2050 East Louise Avenue, Lathrop, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION AND PURPOSE........................................................................ 1 <br /> 2.0. PLAN AMENDMENTS - 40 CFR 112.3 and 112.5 ............................................... 1 <br /> 2.1. SCHEDULED PLAN REVIEWS............................................................................ 2 <br /> 3.0. PLAN ADMINISTRATION AND FACILITY INFORMATION.................................2 <br /> 3.1. MANAGEMENT AND DESIGNATED PERSONNEL - 40 CFR 112.7................... 2 <br /> 3.2. PROFESSIONAL ENGINEER CERTIFICATION - 40 CFR 112.3(d).................... 3 <br /> 3.3. PLAN AVAILABILITY - 40 CFR 112.3(e).............................................................. 3 <br /> 3.4. CROSS-REFERENCE WITH SPCC PROVISIONS (40 CFR 112.7).................... 3 <br /> 3.5. FACILITY DESCRIPTION - 40 CFR 112.7(a)(3) .................................................. 3 <br /> 3.5.1. Location and Activities.................................................................................4 <br /> 3.5.2. Facility Operating Structures and Areas ......................................................4 <br /> 3.5.3. Distance to Navigable Waters and Adjoining Shorelines and Flow Paths ... 5 <br /> 3.5.4. Discharge History ........................................................................................ 5 <br /> 3.5.5. Material Stored at this Facility— 112.7(a)(3)(i)............................................. 5 <br /> 4.0. DISCHARGE PREVENTION - GENERAL SPCC PROVISIONS..........................6 <br /> 4.1. COMPLIANCE WITH APPLICABLE REQUIREMENTS - 40 CFR 112.7(a)(2)..... 6 <br /> 4.2. SPILL REPORTING - 40 CFR 112.7(a)(4) ........................................................... 7 <br /> 4.3. POTENTIAL DISCHARGE VOLUMES AND DIRECTION OF FLOW - 40 CFR <br /> 112.7(b)................................................................................................................ 7 <br /> 4.4. CONTAINMENT AND DIVERSIONARY STRUCTURES - 40 CFR 112.7(c)........ 7 <br /> 4.4.1. Spill Pallets.................................................................................................. 7 <br /> 4.4.2. Fueling Area ................................................................................................8 <br /> 4.4.3. Oil Transfer Areas .......................................................................................8 <br /> 4.4.4. Drainage System ......................................................................................... 8 <br /> 4.4.5. Practicability of Secondary Containment— 40 CFR 112.7(d)........................ 8 <br /> 4.5. INSPECTIONS, TESTS, AND RECORDS - 40 CFR 112.7(e).............................. 9 <br /> 4.5.1. Daily Inspection ........................................................................................... 9 <br /> 4.5.2. Monthly Inspection....................................................................................... 9 <br /> 4.5.3. Annual Inspection ...................................................................................... 10 <br /> 4.5.4. Periodic Integrity Testing ........................................................................... 10 <br /> 4.6. DISCHARGE PREVENTION PROCEDURES AND TRAINING-40 CFR1 12.7(f).... 10 <br /> 4.7. SECURITY - 40 CFR 112.7(g)............................................................................ 11 <br /> 4.8. TANK TRUCK UNLOADING AREAS REQUIREMENTS - 40 CFR 112.7(h or c).... 11 <br /> 4.8.1. Secondary Containment - 40 CFR 112.7(h or c) (1).................................. 11 <br /> 4.8.2. Unloading Procedures - 40 CFR 112.7(h or c)(2) and (3).......................... 11 <br /> 4.9. BRITTLE FRACTURE EVALUATION - 40 CFR 112.7(I).................................... 12 <br /> 4.10. CONFORMANCE WITH LOCAL REQUIREMENTS - 40 CFR 112.7(J) .......... 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.