My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2050
>
2800 - Aboveground Petroleum Storage Program
>
PR0516363
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:48:28 AM
Creation date
9/22/2020 8:04:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0516363
PE
2832
FACILITY_ID
FA0010987
FACILITY_NAME
TEC Equipment
STREET_NUMBER
2050
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
Ave
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
2050 E Louise Ave
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention Control and Countermeasures Plan <br /> TEC Equipment Inc. <br /> 2050 East Louise Avenue, Lathrop, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 5.0. DISCHARGE PREVENTION — SPCC PROVISIONS FOR THE FACILITY........ 12 <br /> 5.1. FACILITY DRAINAGE - 40 CFR 112.8(b) ......................................................... 12 <br /> 5.2. BULK STORAGE CONTAINERS - 40 CFR 112.8 (c)......................................... 12 <br /> 5.2.1. Tank Construction - 40 CFR 112.8 (c)(1)................................................... 13 <br /> 5.2.2. Secondary Containment - 40 CFR 112.8 (c)(2) ......................................... 13 <br /> 5.2.3. Drainage of Berm Areas - 40 CFR 112.8(c)(3) .......................................... 13 <br /> 5.2.4. Corrosion Protection - 40 CFR 112.8(c)(4)................................................ 13 <br /> 5.2.5. Partially Buried and Bunkered Storage Tanks - (40 CFR 112.8(c)(5))....... 14 <br /> 5.2.6. Inspections and Tests - 40 CFR 112.8(c)(6).............................................. 14 <br /> 5.2.7. Heating Coils - 40 CFR 112.8(c)(7) ........................................................... 14 <br /> 5.2.8. Overfill Prevention Systems - 40 CFR 112.8(c)(8)..................................... 14 <br /> 5.2.9. Effluent Treatment Facilities - 40 CFR 112.8(c)(9) .................................... 14 <br /> 5.2.10. Visible Discharges - 40 CFR 112.8(c)(10).................................................. 14 <br /> 5.2.11. Mobile and Portable Containers - 40 CFR 112.8(c)(11) ............................. 15 <br /> 5.3. TRANSFER OPERATIONS, PUMPING, AND IN-PLANT PROCESSES ........... 15 <br /> 5.3.1. Transfer Lines Not In-Service.................................................................... 15 <br /> 5.3.2. Standby Transfer Lines.............................................................................. 15 <br /> 5.3.3. Pipe Supports............................................................................................ 15 <br /> 5.3.4. Aboveground Piping and Valves................................................................ 16 <br /> 5.3.5. Warning Signs ........................................................................................... 16 <br /> 6.0. FACILITY DISCHARGE RESPONSE................................................................. 16 <br /> 6.1. MINOR DISCHARGE RESPONSE .................................................................... 16 <br /> 6.1.1. Minor Discharge Description...................................................................... 16 <br /> 6.1.2. Minor Discharge Cleanup and Guidelines ................................................. 17 <br /> 6.2. MAJOR DISCHARGE RESPONSE.................................................................... 17 <br /> 6.2.1. Major Discharge Description...................................................................... 17 <br /> 6.2.2. Major Discharge Cleanup and Guidelines ................................................. 18 <br /> 6.3. WASTE DISPOSAL............................................................................................ 18 <br /> 6.4. WRITTEN DISCHARGE NOTIFICATION........................................................... 19 <br /> 6.5. CLEANUP CONTRACTORS AND EQUIPMENT SUPPLIERS ..........................20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.