My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
9/22/2020 1:29:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 9: TIGHTEN SELF-CLINCHING STUDS measurements taken in Step 1, Figure 1 (Top of the <br /> Tighten clinch studs securely with a t/z"wrench. Use Face Seal Adaptor below the drain valve outlet in <br /> only the self-clinching studs that are supplied with the spill container to the bottom of the tank). Saw off <br /> the unit. Seating torque is 11.5 ft-lbs min. to 13.5 ft- the excess tube at a 45-degree angle and file off any <br /> lbs max. Do not over tighten. sharp burrs(Refer to Figure 16). Optional: Install <br /> Note: Failure to properly apply and cure the the OPW Tank Bottom Protector on the lower tube <br /> sealant may result in a failure of a pressure (Refer to Installation instructions supplied with the <br /> decay leak test. Tank Bottom Protector). <br /> STEP 10: LOWER TUBE ASSEMBLY STEP 12: PREPARE FILL RISER FOR VALVE <br /> If a vise is used, clamp on the valve body casting INSERTION <br /> only to avoid damage to the float. Mix the remaining <br /> sealant until the color is uniform. Using the mixing IMPORTANT: Inspect the riser pipe for any foreign <br /> stick, generously apply sealant to the first 6 male material. Over spray from tank relining or any <br /> threads on the valve body as shown in figure 10. internal burrs inside of pipe must be removed prior <br /> Make sure coverage is completely around the to installation. Failure to have an unobstructed riser <br /> threads, and work the sealant down into the thread pipe may prevent proper installation or operation of <br /> profile. Quickly thread the lower tube onto the valve the valve. Thoroughly clean top of riser pipe. <br /> body. Tighten the tube securely by hand or with a <br /> strap wrench. Remove excess sealant and smooth Important: Before installing the valve, allow <br /> sealant bead with water moistened mixing stick. sealant to cure for 24 hours. <br /> Important: Allow sealant(epoxy)to cure for 24 STEP 13: REMOVE ELASTIC BAND <br /> hours before installing into tank. Remove the elastic band securing the float to the <br /> valve body. The float will move into an outward <br /> position. <br /> \Apply Sealant completely STEP 14: INSERT DROP <br /> around first 6 threads. TUBE 1 <br /> Make sure the O-Ring gasket is <br /> \ - under the flange of the inlet <br /> tube. Hold the float down <br /> against the valve body and <br /> slowly insert the drop tube <br /> overfill valve into the riser pipe. <br /> Do not force valve into the riser <br /> pipe. If any obstruction or <br /> foreign matter interferes with <br /> smooth insertion of the valve, <br /> Figure 10 the riser pipe must be cleared. <br /> WARNING <br /> Note: Before installing the valve in the tank, a Failure to follow the assembly <br /> pressure test can be performed on the valve to and installation instructions <br /> check for vapor tightness. Seal off both ends of the or use of excessive force to <br /> tube with inflatable plumber's plugs. Apply a insert the OPW 61 SO will <br /> maximum 10"W.C. (1/3 PSI)air pressure. If VOID THE WARRANTY! <br /> pressure does not hold and a leak can be located <br /> with soap solution, do not install the valve. Send the <br /> valve back to OPW for warranty evaluation. Difficulty in removing the <br /> Caution: Do not over-pressure. Excess pressure existing fill tube(if there is one) Figure 14 <br /> can damage the valve means there may be an <br /> obstruction in the riser pipe. Look for burrs, <br /> STEP 11: CUT LOWER TUBE AT 45°ANGLE deformations, excess tank lining material or other <br /> Measuring from the underside of the inlet tube projections that may interfere with easy insertion of <br /> flange, mark the overall length of the drop tube a the OPW 61 SO. The 61 SO is designed for insertion <br /> distance of(B)minus 6"or as per local codes or into schedule 40 pipe. If schedule 80 pipe has been <br /> requirements. Determine dimension (B)from the <br /> 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.