My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
9/22/2020 1:29:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
used for the riser, the 61 SO can not be installed. If Vapor Recovery <br /> seamed pipe has been used, the internal weld bead Riser Fill Riser <br /> may interfere with the OPW 61 SO and prevent <br /> installation. If the OPW 61 SO won't slip in easily <br /> DON'T FORCE IT! Damage to the valve may result C <br /> if excess force is used. Examine the riser pipe <br /> carefully; determine the nature of the obstruction; 6"ria". <br /> take appropriate steps to remove it. oaw }I <br /> Ball Float <br /> STEP 15: CHECK 13'Minimum <br /> Tube Cui Cleiarw A for <br /> INSTALLATION per Local :� Float <br /> Insert the drop tube all the ' Requirements <br /> way into the tank until the ----- -------------- - <br /> flange and gasket seat 6 <br /> onto the top of the Face <br /> Seal Adaptor. The float —Align Float Along Length of Tank --. <br /> will swing out into the <br /> operating position as it Figure 16 <br /> passes into the tank. <br /> Make sure that the float is <br /> aligned along the length <br /> of the tank. The length of �— <br /> the tank can easily be <br /> determined by locating I —� <br /> Rctatable <br /> other manholes or pump Product <br /> boxes that are installed Adapter <br /> around other tank fittings. <br /> Look into the drop tube <br /> and align the deflector <br /> with the length of the L <br /> c <br /> tank. CAUTION: No Figure 15 - _ <br /> obstruction in the tank container J'"`' - ° Jack sc•e, <br /> - <br /> can be within 13"from the center of the riser pipe or wt <br /> the valve may not operate properly. 0 Face Seal <br /> 61so Adapter <br /> STEP 16: ALIGN VALVE Drop Tube i <br /> Install the OPW Jack Screw Kit and a 4" nipple to Figure 16A <br /> lock the valve in place. Refer to the Installation <br /> Instructions supplied with the Jack Screw Kit. Install STEP 17: INSTALL WARNING <br /> the Rotatable Product Adaptor(Refer to Installation PLATE <br /> Instructions supplied with the Rotatable Product Slide the tie wrap over the . <br /> Adaptor.) Make sure that the valve does not rotate _- <br /> while tightening the adaptor by observing the warning plate ears and position <br /> position of the deflector. The valve must remain warning plate against riser pipe <br /> approximately 11" below the <br /> aligned along the length of the tank as in Step adaptor. Tighten the tie wrap <br /> 15. Repeat this step as necessary to assure proper securely. The valve is now fully <br /> valve alignment. installed and in operating <br /> position. <br /> STEP 18: VALVE REMOVAL <br /> The valve can be removed for Figure 17 <br /> tank leak testing, inspection, <br /> etc., by removing the Rotatable Product Adaptor, the <br /> 4" nipple, and the Jack Screw Kit. Reinstall per the <br /> above instructions. <br /> 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.