My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
192
>
2300 - Underground Storage Tank Program
>
PR0505867
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 4:37:47 PM
Creation date
9/22/2020 1:43:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0505867
PE
2361
FACILITY_ID
FA0007059
FACILITY_NAME
H&S Energy Products,#3035
STREET_NUMBER
192
STREET_NAME
LATHROP
STREET_TYPE
Rd
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
192 Lathrop Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TESTABLE PROCEDURE ONLY, FOR STANDARD MOD- STEP 3T: DETERMINE CABLE LENGTH STEP20: PREPARE FILL RISER FOR VALVE INSERTION <br /> ELS, PROCEED TO NEXT PAGE. Run cable along upper tube and over the top plate on - <br /> - <br /> thefloatbracketasshown. With the float In the down IMPORTANT: Inspect the riser pipe for any foreign ma- \ <br /> STEP IT: INSTALL SOCKET ADAPTOR ASSY position (as shown in Figure 3T) align loop In cable with terial. Over spray from tank relining or any Internal <br /> Put cable thru threads in inlet tube and out thru cable rivet and top hole In float bracket Usethedvetasa burts Inside of pipe must be removed prior to Installa- <br /> port on side of Inlet tube. Thread the socket adaptor template to size the loop In the cable and pull cable tion. Failure to have an unobstructed riser pipe may <br /> assembly finger tight into the inlet tube. Note: the ca- tight and crimp ferrule with crimping tool / pliers onto prevent proper installation or operation of the valve. <br /> ble port on the Inlet tube must be in line with the float cable at this location. Trim excess cable with wire cut- Thoroughly clean top of riser pipe. <br /> as shown previously In Figure BA. ter / scissors. For reference, from the seam where the <br /> upper tube and valve body meet to the end of the cable STEP 21: REMOVE ELASTIC BAND <br /> Socket after trimming will require approximately 3.50 of cable. Remove the elastic band securing the float to the valve <br /> adaptor \ body. The float will move Into an outward position. <br /> assembly Cable overfloatbracket <br /> STEP 22: INSERT DROP TUBE <br /> Make sure the upper O-Ring gasket is under the flange <br /> oftheinlettube. Hold the floatdown against the valve <br /> body and slowly insert the drop tube overfill valve Into <br /> the riser pipe. Do not force valve Into the riser pipe. If F1gure23 <br /> any obstruction or foreign matter Interferes with Make sure that the float is aligned along the length of <br /> r• Cable smooth Insertion of the valve, the riser pipe must be the tank. Thelengthofthetankaneasilybedeter- <br /> Seam ` cleared. mined by locating other manholes or pump boxes that <br /> Port are installed around other tank fittings. Lookintothe <br /> Figure 3T WARNING drop tube and align the deflector with the length of the <br /> Failure to follow the assembly tank. <br /> STEP4T: ATTACH CABLE TO FLOAT BRACKET and installation instructions or <br /> Figure IT Ensure cable is over the float bracket. Using the sup- use of excessive force to Insert For testable models only: Unthread the socket adap- <br /> pliedrivet align loop lncable with top hole infloat the DPW 71 SO will VOID THE for assembly from the inlet tube (a3/80 square drive <br /> STEP 2T: PASS CABLE THRU FERRULE bracket and pass rivet thru cable loop and float bracket WARRANTY. extension will attach to the socket adaptor, secure all <br /> Pass cable thru ferrule. Loop cable and then pass cable hole. Using rivet tool for 1/8' dia mandrel attach rivet tools to ensure they don't fall Into the tank or valve) and <br /> back thru ferrule. Keep ferrule loose until cable length and able to the float bracket. See last page for list of Difficulty In removing the existing ensure float and poppet move freely when socket adap- <br /> Isdetermined inthe next step, Note: if cable end frays replacement cable parts. fill tube of there is one) means for assembly is pulled on. When looking down Into the <br /> It may be necessary to trim the cable again to pass thru there may be an obstruction In the upper tube ensure poppet isvisible when socket adap- <br /> ferrule. ��� Attach rfvet to top hole riser pipe. Look for burrs, defor- for is pulled and resets properly when socket adaptor is <br /> mations, excess tank lining materi- released. See page 17 for full testing details. if poppet <br /> al or other projections that may does not actuate freely take appropriate steps to correct <br /> 1/82 mandrel interfere with easy insertion of the before proceeding. <br /> duet m OPW 7150. The 71 S0 is designed <br /> \ for Insertion Into schedule 40 pipe, If F1gure22 CAUTION: No obstruction in the tank an be within <br /> schedule 80 pipe has been used for the 1AIN from the center of the riser pipe or the valve <br /> riser, the 7150 cannot be Installed. Ifseamedplpehas may not operate properly (See Figure 24). <br /> Ferrule been used, the Internal weld bead may Interfere with <br /> Figure4T the 0PW 71 S0 and prevent Installation. If the DPW STEP 24: ALIGN VALVE <br /> 7150 won'tslip in easily DONT FORCE M Damageto Install the OPW Jack Screw Kit and a 4' NPT nipple to <br /> the valve may result if excess force is used. Examine the lock the valve In place. Refer to the Installation lnstruc- <br /> Trim STEP ST: ENSURE PROPER CABLE OPERATION riser pipe carefully; determine the nature of the obstruc- tions supplied with the Jack Screw Kit For testable <br /> able /' Unthread the socket adaptor assembly from the inlet ton; take appropriate steps to remove it, models ensure that the socket adaptor is aligned so <br /> after tube and ensure float and poppet move freely when it does not interfere with the jack screw kit. (see Fig- <br /> step 3T Lapp �� socketadaptorassemblyis pulled on. Itshouldonly STEP 23: CHECK INSTALLATION ure24A). Install the Rotatable Product Adaptor (Refer <br /> require 3' to4' of movement In order to actuate the Insert the drop tube all the way into the tank until the to Installation Instructions supplied with the Product <br /> Figure2T float and poppet Thread socket adaptor assembly fin- flange and gasket seat onto the top of the Face Seal Adaptor.) Make sure that the valve does not rotate <br /> ger tight into inlet tube after testing. Adaptor. The float will swing out Into the operating while tightening the adaptor by observing the position <br /> position as it passes Into the tank. of the deflector. The valve must remain aligned <br /> along the length ofthe tankas In Step 23. Repeat <br /> this step as necessary to assure proper valve alignment. <br /> 13 14 <br /> Vapor Recovery Hil Riser STEP 25: INSTALL WARNING PLATE <br /> 4 Bend the three warning plate ears down then slide the <br /> tie wrap over the warning plate ears and position warn- <br /> ing plate against riser pipe approximately 1' below the <br /> adaptor. Tighten the tie wrap securely. The valve is <br /> kl1l <br /> now fully Installed and in operating position. <br /> OPWNOTE: the warning plate includes )mportantwam- <br /> BallFloat ings, operating parameters, and listing information <br /> A,,Minimum and must be installed. <br /> Clearance for j1 <br /> Tube Cut Float J 40 NPT <br /> per Local <br /> Requirements Nipple <br /> 1 <br /> Gr t 1Manufacturer: •OPW <br /> �— Align Float Along Length ofTank Swivel Model: •71 S0-4' <br /> Product a Jack (4' representssize) <br /> Figure 24 Screw Manufacture Date: <br /> Adaptor <br /> Kit •MFG MMYY' <br /> Orientsocket MWMont. Y=Ye <br /> ar <br /> adaptor be- FOR TESTABLE MODELS ONLY: Check installation <br /> tweenjack again as done In Step 23 to ensure poppet actuates and "" Figure 26 - Product Identification <br /> screw bolts resets properly. See page 17 for full testing details. Ap- F19ure25 <br /> O ply pipe dope to the socket adaptor threads. Pipe dope <br /> should be a non-hardening gasoline resistant pipe STEP 26: VALVE REMOVAL <br /> thread seal compound, install socket adaptor and The valve can be removed for tank leak testing, inspec- <br /> torque to 3.5 ft-lbs (42 In-lbs) minimum to 5.0 ft-lbs (60 tion, etc, by removing the Rotatable Product Adaptor, <br /> In-lbs) maximum. After Installing socket adaptor where the 4' nipple, and the Jack Screw Kit. Reinstallperthe <br /> required, pressure test testable overfill valve per CARR above instructions. <br /> TP201.1 D to ensure valve is vapor tight. <br /> For testable models only: Itis not necessary to re- <br /> move the valve to check poppet movement/ function. <br /> See Page 17 for full testing details. <br /> STEP27: ELECTRONIC LIQUID LEVEL MONITORING <br /> Figure 24A If an electronic level monitor Is Installed, it must be cali- <br /> brated to match the top of the 71 SO valve body, which <br /> must correlate with 95% of the actual tank capacity. <br /> 15 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.