Laserfiche WebLink
TEST INSTRUCTIONS Socket PREVENTIVE MAINTENANCE Good Valve <br /> POPPET & FLOAT MOVEMENTAnnually Inspect the Flapper in the 7150 to see that It Is <br /> adaptor • Deflecopp Shield <br /> FOR TESTABLE MODELS ONLY spenby looking <br /> roced re below). <br /> rop Test <br /> est the opening ptube- �ie� �zz 1th Poppet <br /> spection procedure below). Testthe 715Odmptube '/ <br /> TOOLS NEEDED FOR TESTING: seals with CARR procedure TP-201 .1D. If the drop tube y. otccted <br /> 1. 1/40 square drive extension or 3/80 square drive ex- seal passes testing, no further maintenance is required, <br /> tension with 318' to 1140 socket adapter. a If the drop tube falls testing, replace the drop tube seal <br /> 2. Torque wrench / 1/4' or 3/8' square drive ratchet with DPW P/N: Hl 1931M for 4'Tubes. Re-testthe715O ; <br /> wrench. drop tube with CARB prmedure TP-201.1 D. The lower <br /> 3. Pipe dope. 0 tube c-ring seal DPW P/N: H14840M can also be re- <br /> 4. Flashlight (optional). placed. If this does not correct the leak the 7150 needs - <br /> Open Poppet Closed Poppet to be replaced. <br /> BadValve <br /> TESTSTEP 1 : <br /> Test Figure 1 <br /> - <br /> Remove spill container cover and fill cap from fill adapt- FOR TESTABLE MODELS ONLY: The socket adaptor Deflection Shield <br /> er and look down into the tube and make sure no debris Pull on extension and ran be removed and poppet and float movement and with poppet exposed <br /> or foreign objects are present. If debris or foreign ob- socket adaptor function inspected without removing the valve. See <br /> jects are present take appropriate steps before proceed- - Page 17 for full testing details. if replacement parts are - <br /> Ing. Look down Into the tube and ensure poppet is dopill _ _ _ needed for testable models the following items are <br /> completely protected by the deflection shield. See Test �� —_ �— available. DPW P/N 206741 Testable lnletTube S/A, . <br /> Figure 1 . If poppet is exposed and tank is not full the r `, i-- - 206740 Socket Adaptor and Cable Assembly, and 61 SOK <br /> overfill valve should be replaced. A flashlight may helpl l -0001 Float Kit. <br /> when inspecting the tube. I - Figure27 <br /> \ CAUTION: Do not insert any foreign object into drop <br /> TEST STEP 2: tube if flapper is in the closed position. For exam- Note: Figure 27 shows poppet location with floatarm <br /> Unthread the socket adaptor assembly from the inlet 'p � ' t—: ple, a tank level measuring stick. This will damage notactivated. <br /> tube using 1/4' square drive extension and wrench, s the valve and void the Warranty. ALWAYS check <br /> The extension will attach to the socket adaptor. Secure Flapper location before "sticking" the tank. Ifflap- INSP4. Inspect the Boat by liking upward. The Float <br /> all tools to ensure they don't fall Into the tank or valve. _ per is In the closed position, the tank is either over- should move freely without any binding. See Figure <br /> With the extension still attached pull on the socket -----_— filled and you need to wait until the liquid level goes 28* <br /> adaptor and cable assembly and ensure float and pop- J ( down or the 7150 is damaged and needs to be re- _ <br /> pet move / function properly. It should only require 3' _ - -_`�- s` - placed. f Open <br /> to 40 of movement and less than 5 lbs of force in order Inspection Procedure to Ensure Proper Operation j \ <br /> to actuate the float and poppet. When looking down <br /> Into the upper tube ensure poppet is visible and moves Note: For testable models valve does not need to be <br /> into the flow path (see Test Figure i & 2) when socket Open r I removed from tank See page 17 for testable lnstrur <br /> adaptor ispulled and resets property when socket adap- Poppet 1 Closed tions. - <br /> torlsreleased. if poppetdoes not actuate freely take Poppet ( Float moves INSP 1 . Remove the overfill valve from the tank asde- <br /> appropriatesteps tocorrect. L 1 I up scribed instep 26. Float <br /> TEST STEP 3: INSP 2. Visually Inspect the valve for damage. Make - <br /> Apply pipe dope tothe socket adaptor threads. Pipe sure no debris or foreign objects a re in or on the valve. <br /> dope should be a non-hardening gasoline resistant pipe INS 3. With the float in the normal (down) position, <br /> thread seal compound. Make sure poppet and float I visually inspect the valve to ensure the poppet is not Figure2B <br /> have reset properly and are not visible then install sock- I I I I exposed outside the deflection shield. See Figure 27. <br /> et adaptor and torque to 3.5 ft-lbs (42 in-lbs) minimum INSP S. View down the tube to ensure the poppet is <br /> to 5.0 ft-lbs (601n-lbs) maximum. After installing socket moving into the Row path when lifting the Float. See <br /> adaptor, to ensure vapor tightness, DPW recommends Figure 29. <br /> conducting pressure testing perCARBTP201 .1 D. Some Test Figure2 <br /> areas may require pressure testing of overfill valve per <br /> CARE TP201 .1 D to ensure valve Is vapor tight. If the <br /> drop tube fails pressure testing it may be necessary to <br /> check the seal at the poppet adaptor threads. Reinstall <br /> fill cap and spill container cover after testing. <br /> 17 18 <br /> Appendix A <br /> r— <br /> dosed 7150 Overfill Valve UpperTube Calculation Worksheet <br /> Important: This is meant to he supplemental worksheet and not a substitute to following the Installation <br /> = manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion (AHJ) and review local, state, and national codes to determine the regulatory requirements governing <br /> shut-off capacity In your region, as well as take Into account other considerations such as extreme tank tilt. <br /> i <br /> - Desired tank capacity for shuFoH: 50%= <br /> - Dipstick Number on Tank Chart that corresponds to 100% volume (Y) = m <br /> -- - - - -- Dipstick Number on Tank Chart that corresponds to 5O% (X) = — O M <br /> F1gure29 (Z) <br /> UpperTube Reference Number Z=Y-X 2 <br /> INSP 6. If there is no apparent damage or restrictions UpperTube Depth Inside Tank C = Z-2' <br /> reinstall the valve per the above Instructions and test Q (C) <br /> per local requirements. Distance from top sealing surface for 7150 Lip' to Inside the <br /> top of Storage Tank2 A= <br /> 71 SO Performance Specifications <br /> This Overfill Prevention Valve has been manufactured <br /> and tested to, and met, the following California specifi- For Non-Testable 71 SO models anty <br /> cations. Performance Requirement: Leak rate to be less In all cases for non-testable 71 SO models, the top of the valve body must protrude at least 6 Y2' into the tank to <br /> than or equal to 0.17 CFH@2,W W.C. provide a minimal clearance for proper operation? Additionally the total UpperTube Length must beat least 16' <br /> of length to Include the protective bend in the tube. <br /> Torque Specification <br /> Tapthe Screws, $10-24 thread cutting, 20 in-lbs mini- IsClers than614' Yes No <br /> / <br /> mum to 35 in-lbs maximum. Testable Models Only: <br /> Socket Adaptor, 1/4' NPT, 3.5 ft-lbs (421n-lbs) minimum <br /> to 5.0 ft-lbs (60 in-lbs) maximum, <br /> If NO, UpperTube Length (D)= C + A <br /> If YES, Upper Tube Length (0)= 6 % 0+ A <br /> IMPORTANT: Leave these installation instructions Upper Tube Length = <br /> and maintenance procedures with the station opera- <br /> tor. <br /> For Testable 7150 models only <br /> In all cases for Testable 71 SO models, the top of the valve body must protrude at least 6 'h' into the tank to provide <br /> a minimal clearance for proper operation' Additionally the total UpperTube Length must beat least 14 'h0of <br /> length to Include the protective bend In the tube. <br /> Is Clessthan5' Yes / No <br /> If NO, Upper Tube Length (D)= C + A - 1 14 ' <br /> If YES, UpperTube Length (D) = 6 'k' + A - 1 14 ' <br /> Upper Tube Length = <br /> ' SealingsuNce maybe the top ofthefaceSealAdaptor, thebulkinsealing kdgelnsldesomespil/rontal rsoronnon- <br /> porni7htapplk tfansthe top oftheppenipple <br /> r SomeilndetgmundStoregetanksudlizea manwaysystem atthe tap Alakesureto use the topofthesto ge tankfor <br /> urementandnottotopoftbemanway. 0oonsultyrorundergmundtankmanufactumrforhe/ghtoftheman y <br /> 2 Thismeasurementistaken from theseam where the uppertube isattachedto the wAebodyto thelmldeofthe tank top <br /> 19 20 <br />