My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 11:25:17 AM
Creation date
9/22/2020 2:57:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N.10 A Q U I N AMENDED Environmental Health Department <br /> COUNTY ze 4t15 it <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> MAIN STREET ARCO AM PM` 1100 S MAIN ST, MANTECA March 27, 2019 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 206 CCR 2712 Failure to comply with UST operating permit conditions. <br /> In the maintenance records a work order dated 7/2/18 along with invoice#31546 stating a replacement of 87 <br /> product STP sensor from a 323 sensor to a 208 sensor not"like for like", EHD was not notified of the replacement <br /> nor was a permit was obtained from EHD for the replacement.The following conditions are required to meet No <br /> Permit Required requirements like for like replacement: <br /> 1. Email EHD a scope of work by emailing to UST@sjcehd.com. <br /> 2. Notify the EHD of the time and date of the repair work by emailing to UST@sjcehd.com <br /> or fax to(209)468-3433.An EHD inspector may stop by the facility to inspect the repair and verify the technician's <br /> certifications. <br /> 3.The service company must install the part and test the system to verify functionality. <br /> 4.The service company must provide the following documentation to the tank owner/operator for inspector review <br /> during annual UST inspection: <br /> a. Description of part(s)installed <br /> b. Name&UST ICC#of Service technician doing the work(manufacturer certification proof) <br /> c. Testing done to verify functionality of the repair <br /> Provide proof of functionality verification testing conducted at the time of sensor replacement. <br /> Immediately obtain a permit from the EHD for the replacement.A"Failure to Obtain a Permit"penalty applies. <br /> This is a minor violation. <br /> FA0007464 PR0506504 SCO01 03/27/2019 <br /> EHD 23-01 Rev.09/28/2018 Page 6 of 8 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.