My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2526
>
2200 - Hazardous Waste Program
>
PR0514248
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2020 5:20:11 PM
Creation date
9/22/2020 4:37:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514248
PE
2294
FACILITY_ID
FA0010245
FACILITY_NAME
DTE STOCKTON LLC
STREET_NUMBER
2526
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2526 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The project will not result in exposure of structures to damage from seismic related liquefaction, and <br /> other static hazards. <br /> The project will not result in structural damage caused by expansive soils. <br /> The project will not result in substantial soil erosion and loss of topsoil from land grading and project <br /> operation. <br /> B. Environmental Effects Of The Project That Are Potentially Significant,But That <br /> Can Be Mitigated To A Less Than Significant Level. <br /> None <br /> C. Effects Of The Project That Cannot Be Mitigated To A Level Less Than <br /> Significant. <br /> None <br /> D. Cumulative Environmental Effects Of The Proposed Project That Will Have A <br /> Less Than Significant Impact On The Environment. <br /> The project will not result in cumulative impacts to geology and soils. <br /> E. Cumulative Environmental Effects Of The Proposed Project That Will Have A <br /> Significant Impact On The Environment. <br /> None <br /> Hazards And Hazardous Materials <br /> A. Environmental Effects Of The Project Found To Have No Impact On The <br /> Environment,or Have A Less Than Significant Impact On The Environment. <br /> None <br /> B. Environmental Effects Of The Project That Are Potentially Significant, But That <br /> Can Be Mitigated To A Less Than Significant Level. <br /> Potential Significant Effect <br /> Without appropriate mitigation, hazardous materials stored and used on site could be inadvertently <br /> released into the environment in accident/upset conditions. <br /> Description of Specific Impact <br /> The discharge to the depleted gypsum pits of permitted waste streams will not involve the transport, use <br /> and storage of large quantities of hazardous materials. Such materials will be limited to the minimal <br /> quantities of fuels, oils, lubricants, hydraulic fluids, etc. utilized by the equipment at the Project area. <br /> Without proper management, potentially significant impacts could occur during a release thereof. <br /> Findings of Fact—Section 15091 March 15,2016 <br /> H.M.Holloway Landfill Modification Project Final Board of Supervisors <br /> 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.