Laserfiche WebLink
The project will not result in exposure of structures to damage from seismic related liquefaction, and <br /> other static hazards. <br /> The project will not result in structural damage caused by expansive soils. <br /> The project will not result in substantial soil erosion and loss of topsoil from land grading and project <br /> operation. <br /> B. Environmental Effects Of The Project That Are Potentially Significant,But That <br /> Can Be Mitigated To A Less Than Significant Level. <br /> None <br /> C. Effects Of The Project That Cannot Be Mitigated To A Level Less Than <br /> Significant. <br /> None <br /> D. Cumulative Environmental Effects Of The Proposed Project That Will Have A <br /> Less Than Significant Impact On The Environment. <br /> The project will not result in cumulative impacts to geology and soils. <br /> E. Cumulative Environmental Effects Of The Proposed Project That Will Have A <br /> Significant Impact On The Environment. <br /> None <br /> Hazards And Hazardous Materials <br /> A. Environmental Effects Of The Project Found To Have No Impact On The <br /> Environment,or Have A Less Than Significant Impact On The Environment. <br /> None <br /> B. Environmental Effects Of The Project That Are Potentially Significant, But That <br /> Can Be Mitigated To A Less Than Significant Level. <br /> Potential Significant Effect <br /> Without appropriate mitigation, hazardous materials stored and used on site could be inadvertently <br /> released into the environment in accident/upset conditions. <br /> Description of Specific Impact <br /> The discharge to the depleted gypsum pits of permitted waste streams will not involve the transport, use <br /> and storage of large quantities of hazardous materials. Such materials will be limited to the minimal <br /> quantities of fuels, oils, lubricants, hydraulic fluids, etc. utilized by the equipment at the Project area. <br /> Without proper management, potentially significant impacts could occur during a release thereof. <br /> Findings of Fact—Section 15091 March 15,2016 <br /> H.M.Holloway Landfill Modification Project Final Board of Supervisors <br /> 28 <br />