Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM JlPage a of s <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed If a monitoring panel is used to perform leak detection monftoring. Y N NA <br /> Are the visual and audible alarms operational? ❑X ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, 1:1 El <br /> tested and confirmed operational? <br /> 19 Were all sensors installed at lowest point of secondary containment and positioned so that other equipment wil, not interfere unth [9 E] E]their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ❑X 1 ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected,functionally tested,and confirmed operational? X❑ ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically El Eldisconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? <br /> Which sensors initiate positive shut down? (Check all that apply.) ® 1:1 El <br /> If <br /> QUnder-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? X❑ ❑ I ❑ <br /> For any answer of"N"above,describe in Section!X how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> X Check this box if tank gauging is used only for inventory control.(Do not complete this section.) <br /> ❑Check this box if NO tank gauging equipment is installed.(00 not complete this section) Y N NA <br /> This section must be completed If In-tank gamgima is used to perforin leak detection monitoring, <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination,including testing for El ❑ <br /> round faults? <br /> El <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely,functionally <br /> tested and confirmed operational? El El <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ <br /> Were all probes reinstalled properly? ❑ E ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> For any answer of"N"above,describe in Section XI how and when these deficiencies were or will be corrected <br /> XI. COMMENTS <br /> Y=Yes,N=No.NA=Not Applicable <br />