Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6 <br /> XII. LINE LEAK DETECTOR TESTING <br /> F[�--�]Cheeck ox if line leak detectors(LLD)are NOT installed.(00 not complete this section) Y N NA <br /> This section must be cam !e#ed If LLDs are installed. <br /> Was a leak simulated to verify LLD performance? X❑ ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified: X❑3 GPH ❑0.1 GPH ❑0.2 GPH <br /> Was the testing apparatus properly calibrated? ❑X ❑ ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ I ❑ X❑ <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? ❑X ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? ❑ I ❑ ❑X <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ 1 ❑ X❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ ❑ X❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? ❑ ❑ X❑ <br /> Were all items on the equipment manufacturers maintenance checklist completed? ❑X ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? X❑ ❑ ❑ <br /> For any answer of"N"above,describe In Section Xlll how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM 1 PRESSURE i HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> X Check this box if VPH monitoring is NOT used. (Do not complete this section) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) ❑Vacuum ❑Pressure ❑Hydrostatic <br /> Sensor ID Component(S)Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail I EI-Pass. ❑Fail <br /> ❑Pass ❑Fail 1 ❑Pass ❑Fail <br /> ❑Pass ❑Fail I ❑Pass ❑Fail <br /> ❑Pass ❑Fail 1 ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fait <br /> How was interstitial communication verified? ❑Simulated Leak at Far Ends of the Interstitial Space ❑Visual Inspection <br /> Other Describe the method in section XV below Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑Yes ❑No mescibe the reason in section XV below <br /> For any answer of"Fail"above,describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH=Gallons Per Hour,Y=Yes,N=No,NA=Not Applicable,VPH=VacuumfP essure/HydmsTatic,ID=Identification <br />